M. Caruso, P. Livreri, R. Miceli, F. Viola, M. Martino
{"title":"大学校园电动汽车充电站","authors":"M. Caruso, P. Livreri, R. Miceli, F. Viola, M. Martino","doi":"10.1109/INTLEC.2017.8214206","DOIUrl":null,"url":null,"abstract":"This paper faces the technical and economic challenges related to the design of a green recharge area for electric vehicles at the Campus of Palermo, Italy, with the aim of reduce both costs and pollution connected to the charging process. Based on the behaviour of the student population, the electrical load is identified and two possible solutions are evaluated to manage the peak load: an orientation of the panels increasing the power at defined time and the use of a storage system. The main strength and weakness points of two systems are investigated by taking into account the Levelized Cost of Energy (LCOE), which reaches 75.3 €/MWh for the orientation of panel and 103 €/MWh for storage system. Furthermore, the cost of the topologies of power plant and the cost of energy are deeply discussed.","PeriodicalId":366207,"journal":{"name":"2017 IEEE International Telecommunications Energy Conference (INTELEC)","volume":"40 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Ev charging station at university campus\",\"authors\":\"M. Caruso, P. Livreri, R. Miceli, F. Viola, M. Martino\",\"doi\":\"10.1109/INTLEC.2017.8214206\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper faces the technical and economic challenges related to the design of a green recharge area for electric vehicles at the Campus of Palermo, Italy, with the aim of reduce both costs and pollution connected to the charging process. Based on the behaviour of the student population, the electrical load is identified and two possible solutions are evaluated to manage the peak load: an orientation of the panels increasing the power at defined time and the use of a storage system. The main strength and weakness points of two systems are investigated by taking into account the Levelized Cost of Energy (LCOE), which reaches 75.3 €/MWh for the orientation of panel and 103 €/MWh for storage system. Furthermore, the cost of the topologies of power plant and the cost of energy are deeply discussed.\",\"PeriodicalId\":366207,\"journal\":{\"name\":\"2017 IEEE International Telecommunications Energy Conference (INTELEC)\",\"volume\":\"40 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 IEEE International Telecommunications Energy Conference (INTELEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/INTLEC.2017.8214206\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 IEEE International Telecommunications Energy Conference (INTELEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INTLEC.2017.8214206","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
This paper faces the technical and economic challenges related to the design of a green recharge area for electric vehicles at the Campus of Palermo, Italy, with the aim of reduce both costs and pollution connected to the charging process. Based on the behaviour of the student population, the electrical load is identified and two possible solutions are evaluated to manage the peak load: an orientation of the panels increasing the power at defined time and the use of a storage system. The main strength and weakness points of two systems are investigated by taking into account the Levelized Cost of Energy (LCOE), which reaches 75.3 €/MWh for the orientation of panel and 103 €/MWh for storage system. Furthermore, the cost of the topologies of power plant and the cost of energy are deeply discussed.