越南资本管理和预算案例研究

L. Nguyen, Meagan M. Jordan, T. Nguyễn
{"title":"越南资本管理和预算案例研究","authors":"L. Nguyen, Meagan M. Jordan, T. Nguyễn","doi":"10.4018/978-1-5225-7329-6.CH013","DOIUrl":null,"url":null,"abstract":"Divided into four parts, this chapter examines infrastructure investment in Vietnam through the lens of a normative framework for capital management and budgeting. Part 1 provides an overview of the country's socio-economic, political, and financial background that would affect the capital management processes. Part 2 introduces the status of Vietnam's infrastructure and its challenges. Part 3 is a comprehensive review of current procedures and processes of capital planning, budgeting, implementation, and maintenance being practiced in Vietnam. The authors then compare and contrast Vietnam's practices with the recommended provisions of the normative framework. Part 4 reviews the probable consequences associated with infrastructure inefficiency, which are implied by Vietnam's inconsistent practices with the framework. This chapter culminates with conclusions and recommendations for capital management and budgeting that are more specific to a developing country like Vietnam.","PeriodicalId":407434,"journal":{"name":"Capital Management and Budgeting in the Public Sector","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Vietnam Capital Management and Budgeting Case Study\",\"authors\":\"L. Nguyen, Meagan M. Jordan, T. Nguyễn\",\"doi\":\"10.4018/978-1-5225-7329-6.CH013\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Divided into four parts, this chapter examines infrastructure investment in Vietnam through the lens of a normative framework for capital management and budgeting. Part 1 provides an overview of the country's socio-economic, political, and financial background that would affect the capital management processes. Part 2 introduces the status of Vietnam's infrastructure and its challenges. Part 3 is a comprehensive review of current procedures and processes of capital planning, budgeting, implementation, and maintenance being practiced in Vietnam. The authors then compare and contrast Vietnam's practices with the recommended provisions of the normative framework. Part 4 reviews the probable consequences associated with infrastructure inefficiency, which are implied by Vietnam's inconsistent practices with the framework. This chapter culminates with conclusions and recommendations for capital management and budgeting that are more specific to a developing country like Vietnam.\",\"PeriodicalId\":407434,\"journal\":{\"name\":\"Capital Management and Budgeting in the Public Sector\",\"volume\":\"27 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Capital Management and Budgeting in the Public Sector\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4018/978-1-5225-7329-6.CH013\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Capital Management and Budgeting in the Public Sector","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4018/978-1-5225-7329-6.CH013","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本章分为四个部分,通过资本管理和预算的规范框架来考察越南的基础设施投资。第1部分概述了影响资本管理过程的国家社会经济、政治和金融背景。第2部分介绍了越南基础设施的现状及其面临的挑战。第3部分是对越南目前资本规划、预算、实施和维护的程序和过程的全面审查。然后,作者将越南的做法与规范框架的建议条款进行了比较和对比。第4部分回顾了与基础设施效率低下相关的可能后果,这是越南与框架不一致的做法所暗示的。本章最后总结了资本管理和预算的结论和建议,这些建议更具体地针对越南这样的发展中国家。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Vietnam Capital Management and Budgeting Case Study
Divided into four parts, this chapter examines infrastructure investment in Vietnam through the lens of a normative framework for capital management and budgeting. Part 1 provides an overview of the country's socio-economic, political, and financial background that would affect the capital management processes. Part 2 introduces the status of Vietnam's infrastructure and its challenges. Part 3 is a comprehensive review of current procedures and processes of capital planning, budgeting, implementation, and maintenance being practiced in Vietnam. The authors then compare and contrast Vietnam's practices with the recommended provisions of the normative framework. Part 4 reviews the probable consequences associated with infrastructure inefficiency, which are implied by Vietnam's inconsistent practices with the framework. This chapter culminates with conclusions and recommendations for capital management and budgeting that are more specific to a developing country like Vietnam.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信