{"title":"泛欧网络利用共享基础设施的新里程碑","authors":"Sobhan Memari, X. Bourgeat, Mattia Pazienza, C. Rémy, R. De Zan, M. Marzinotto","doi":"10.1109/AEITHVDC52364.2021.9474607","DOIUrl":null,"url":null,"abstract":"The focus of this paper is on the Piedmont-Savoy link, $\\mathrm{a}\\pm 320$ kV HVDC interconnection between the Italian and French network, which reinforces the Pan-European electricity network. This project is an example of the feasibility of synergy with existing highways and tunnels. However, due to peculiarities of the link, numerous system design and installation challenges have been overcome during the project and are presented in this paper.","PeriodicalId":403034,"journal":{"name":"2021 AEIT HVDC International Conference (AEIT HVDC)","volume":"55 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-05-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A New Milestone In Pan-European Network Leveraging On Shared Infrastructures\",\"authors\":\"Sobhan Memari, X. Bourgeat, Mattia Pazienza, C. Rémy, R. De Zan, M. Marzinotto\",\"doi\":\"10.1109/AEITHVDC52364.2021.9474607\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The focus of this paper is on the Piedmont-Savoy link, $\\\\mathrm{a}\\\\pm 320$ kV HVDC interconnection between the Italian and French network, which reinforces the Pan-European electricity network. This project is an example of the feasibility of synergy with existing highways and tunnels. However, due to peculiarities of the link, numerous system design and installation challenges have been overcome during the project and are presented in this paper.\",\"PeriodicalId\":403034,\"journal\":{\"name\":\"2021 AEIT HVDC International Conference (AEIT HVDC)\",\"volume\":\"55 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-05-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 AEIT HVDC International Conference (AEIT HVDC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/AEITHVDC52364.2021.9474607\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 AEIT HVDC International Conference (AEIT HVDC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AEITHVDC52364.2021.9474607","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A New Milestone In Pan-European Network Leveraging On Shared Infrastructures
The focus of this paper is on the Piedmont-Savoy link, $\mathrm{a}\pm 320$ kV HVDC interconnection between the Italian and French network, which reinforces the Pan-European electricity network. This project is an example of the feasibility of synergy with existing highways and tunnels. However, due to peculiarities of the link, numerous system design and installation challenges have been overcome during the project and are presented in this paper.