监控实现发布准备中的瓶颈:跨十个OSS项目的回顾性案例研究

S. Alam, S. Shahnewaz, Dietmar Pfahl, G. Ruhe
{"title":"监控实现发布准备中的瓶颈:跨十个OSS项目的回顾性案例研究","authors":"S. Alam, S. Shahnewaz, Dietmar Pfahl, G. Ruhe","doi":"10.1145/2652524.2652549","DOIUrl":null,"url":null,"abstract":"Context: Not releasing software on time can cause substantial loss in revenue. Continuous awareness of the product release status is required. Release readiness is a time-dependent attribute of the status of the product release, which aggregates the degree of satisfaction of a portfolio of release process and product measures.\n Goal: At different stages of a release cycle, the goal is to understand frequencies and pattern of occurrence of factors affecting project success by restricting the status of release readiness (called bottlenecks).\n Method: As a form of explorative case study research, we analyzed ten open source software (OSS) projects taken from the GitHub repository. As a retrospective study covering a period of 28 weeks, we monitored eight release readiness attributes and identified their impact on release readiness over time across the ten projects.\n Results: Feature completion rate, Bug fixing rate, and Features implemented were observed as the most frequent bottlenecks. The most frequent transition between bottlenecks is from Pull-request completion rate to Bug fixing rate. With the exception of Pull-request completion rate, no significant differences were found in occurrence of bottleneck factors between early and late stage of the release cycle.\n Conclusions: We received an initial understanding of the most frequent bottleneck factors for release readiness and their likelihood of subsequent occurrence. This is intended to guide the effort spent on improving release engineering.","PeriodicalId":124452,"journal":{"name":"International Symposium on Empirical Software Engineering and Measurement","volume":"89 10","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-09-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Monitoring bottlenecks in achieving release readiness: a retrospective case study across ten OSS projects\",\"authors\":\"S. Alam, S. Shahnewaz, Dietmar Pfahl, G. Ruhe\",\"doi\":\"10.1145/2652524.2652549\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Context: Not releasing software on time can cause substantial loss in revenue. Continuous awareness of the product release status is required. Release readiness is a time-dependent attribute of the status of the product release, which aggregates the degree of satisfaction of a portfolio of release process and product measures.\\n Goal: At different stages of a release cycle, the goal is to understand frequencies and pattern of occurrence of factors affecting project success by restricting the status of release readiness (called bottlenecks).\\n Method: As a form of explorative case study research, we analyzed ten open source software (OSS) projects taken from the GitHub repository. As a retrospective study covering a period of 28 weeks, we monitored eight release readiness attributes and identified their impact on release readiness over time across the ten projects.\\n Results: Feature completion rate, Bug fixing rate, and Features implemented were observed as the most frequent bottlenecks. The most frequent transition between bottlenecks is from Pull-request completion rate to Bug fixing rate. With the exception of Pull-request completion rate, no significant differences were found in occurrence of bottleneck factors between early and late stage of the release cycle.\\n Conclusions: We received an initial understanding of the most frequent bottleneck factors for release readiness and their likelihood of subsequent occurrence. This is intended to guide the effort spent on improving release engineering.\",\"PeriodicalId\":124452,\"journal\":{\"name\":\"International Symposium on Empirical Software Engineering and Measurement\",\"volume\":\"89 10\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-09-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Symposium on Empirical Software Engineering and Measurement\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/2652524.2652549\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Symposium on Empirical Software Engineering and Measurement","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/2652524.2652549","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

背景:不按时发布软件会导致大量的收入损失。需要持续了解产品发布状态。发布准备是产品发布状态的一个与时间相关的属性,它集合了发布过程和产品度量组合的满意程度。目标:在发布周期的不同阶段,目标是通过限制发布准备状态(称为瓶颈)来了解影响项目成功的因素发生的频率和模式。方法:作为探索性案例研究的一种形式,我们分析了来自GitHub存储库的十个开源软件(OSS)项目。作为一项涵盖28周的回顾性研究,我们监控了8个发布准备属性,并确定了它们在10个项目中随时间推移对发布准备的影响。结果:特性完成率、Bug修复率和特性实现是最常见的瓶颈。瓶颈之间最常见的转换是从拉取请求完成率到Bug修复率。除Pull-request完成率外,在发布周期的前期和后期,瓶颈因素的发生没有显著差异。结论:我们获得了发布准备的最常见的瓶颈因素以及它们随后发生的可能性的初步理解。这是为了指导用于改进发布工程的工作。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Monitoring bottlenecks in achieving release readiness: a retrospective case study across ten OSS projects
Context: Not releasing software on time can cause substantial loss in revenue. Continuous awareness of the product release status is required. Release readiness is a time-dependent attribute of the status of the product release, which aggregates the degree of satisfaction of a portfolio of release process and product measures. Goal: At different stages of a release cycle, the goal is to understand frequencies and pattern of occurrence of factors affecting project success by restricting the status of release readiness (called bottlenecks). Method: As a form of explorative case study research, we analyzed ten open source software (OSS) projects taken from the GitHub repository. As a retrospective study covering a period of 28 weeks, we monitored eight release readiness attributes and identified their impact on release readiness over time across the ten projects. Results: Feature completion rate, Bug fixing rate, and Features implemented were observed as the most frequent bottlenecks. The most frequent transition between bottlenecks is from Pull-request completion rate to Bug fixing rate. With the exception of Pull-request completion rate, no significant differences were found in occurrence of bottleneck factors between early and late stage of the release cycle. Conclusions: We received an initial understanding of the most frequent bottleneck factors for release readiness and their likelihood of subsequent occurrence. This is intended to guide the effort spent on improving release engineering.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信