孤岛中压电网应急发电机

T. Bragatto, L. D’Orazio, A. Cerretti, A. Geri, F. Gatta, M. Maccioni, R. Turri
{"title":"孤岛中压电网应急发电机","authors":"T. Bragatto, L. D’Orazio, A. Cerretti, A. Geri, F. Gatta, M. Maccioni, R. Turri","doi":"10.23919/AEIT56783.2022.9951750","DOIUrl":null,"url":null,"abstract":"In order to increase network resilience, Distribution System Operators are evaluating different remedial actions against extreme events that lead to long interruptions. This paper evaluates the technical solutions for deploying an emergency generator (EG) supplying an islanded Medium Voltage (MV) network. The paper identifies the minimum technical requirements and different neutral grounding arrangements that can be adopted. Taking into account the maximum size of the mobile generators available in the market, evaluation results show that supplying a section of a distribution network could be done only if cable length is lower than 5 km and maximum load is less than 0.5 MW.","PeriodicalId":253384,"journal":{"name":"2022 AEIT International Annual Conference (AEIT)","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Emergency Generators for Supplying Islanded MV Networks\",\"authors\":\"T. Bragatto, L. D’Orazio, A. Cerretti, A. Geri, F. Gatta, M. Maccioni, R. Turri\",\"doi\":\"10.23919/AEIT56783.2022.9951750\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In order to increase network resilience, Distribution System Operators are evaluating different remedial actions against extreme events that lead to long interruptions. This paper evaluates the technical solutions for deploying an emergency generator (EG) supplying an islanded Medium Voltage (MV) network. The paper identifies the minimum technical requirements and different neutral grounding arrangements that can be adopted. Taking into account the maximum size of the mobile generators available in the market, evaluation results show that supplying a section of a distribution network could be done only if cable length is lower than 5 km and maximum load is less than 0.5 MW.\",\"PeriodicalId\":253384,\"journal\":{\"name\":\"2022 AEIT International Annual Conference (AEIT)\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-10-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 AEIT International Annual Conference (AEIT)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.23919/AEIT56783.2022.9951750\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 AEIT International Annual Conference (AEIT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23919/AEIT56783.2022.9951750","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

为了提高电网的恢复能力,配电系统运营商正在评估不同的补救措施,以应对导致长时间中断的极端事件。本文对孤岛中压电网配置应急发电机供电的技术方案进行了评价。本文确定了可采用的最低技术要求和不同的中性点接地安排。考虑到市场上可用的移动发电机的最大尺寸,评估结果表明,只有电缆长度小于5公里,最大负载小于0.5 MW,才能为配电网的一段供电。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Emergency Generators for Supplying Islanded MV Networks
In order to increase network resilience, Distribution System Operators are evaluating different remedial actions against extreme events that lead to long interruptions. This paper evaluates the technical solutions for deploying an emergency generator (EG) supplying an islanded Medium Voltage (MV) network. The paper identifies the minimum technical requirements and different neutral grounding arrangements that can be adopted. Taking into account the maximum size of the mobile generators available in the market, evaluation results show that supplying a section of a distribution network could be done only if cable length is lower than 5 km and maximum load is less than 0.5 MW.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信