{"title":"采用混合液压拉拔装置的低成本桥塞和弃井","authors":"Tengku Khairul Izwan Tengku Ahmad, Abdul Hanif Abdullah","doi":"10.2118/208473-ms","DOIUrl":null,"url":null,"abstract":"\n Plug and Abandonment (P&A) operations with conventional Hydraulic Workover Unit (WHU) have an enormous benefit and impact on low-cost P&A campaign in Malaysia compare with using conventional drilling rig. Subsequently, this Hybrid Hydraulic Pulling Unit (HHPU) was the first successful deployed and safely delivered for P&A campaign together with conductor removal in offshore West Malaysia.\n This paper presents case study that showcase the capability of HHPU for low-cost permanent P&A campaign by eliminate requirement for additional bringing rigging-up and rigging-down of casing jack unit for conductor removal operation. The unit manage to cut and pull-out the existing completion strings, setting cement plugs, cut and pull-out multiple strings of casing along with retrieving the 24″ conductors delivering the most advantageous outcome for P&A campaign safely, efficiently and cost effectively. It was invented from 340K HWU with improvise features that capable of pull-out existing completion string and removal of the conductor with size up to 36″.\n This paper demonstrates a unique combination of techniques and equipment of a successfully low-cost P&A operation with excellent client satisfaction with no incident and accident were recorded. The end results may contradict traditional P&A methods, but the case history can be used for future reference or potential replication in South East Asia region.","PeriodicalId":211321,"journal":{"name":"Day 2 Wed, December 01, 2021","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-11-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Low Cost Plug and Abandonment with Hybrid Hydraulic Pulling Unit\",\"authors\":\"Tengku Khairul Izwan Tengku Ahmad, Abdul Hanif Abdullah\",\"doi\":\"10.2118/208473-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Plug and Abandonment (P&A) operations with conventional Hydraulic Workover Unit (WHU) have an enormous benefit and impact on low-cost P&A campaign in Malaysia compare with using conventional drilling rig. Subsequently, this Hybrid Hydraulic Pulling Unit (HHPU) was the first successful deployed and safely delivered for P&A campaign together with conductor removal in offshore West Malaysia.\\n This paper presents case study that showcase the capability of HHPU for low-cost permanent P&A campaign by eliminate requirement for additional bringing rigging-up and rigging-down of casing jack unit for conductor removal operation. The unit manage to cut and pull-out the existing completion strings, setting cement plugs, cut and pull-out multiple strings of casing along with retrieving the 24″ conductors delivering the most advantageous outcome for P&A campaign safely, efficiently and cost effectively. It was invented from 340K HWU with improvise features that capable of pull-out existing completion string and removal of the conductor with size up to 36″.\\n This paper demonstrates a unique combination of techniques and equipment of a successfully low-cost P&A operation with excellent client satisfaction with no incident and accident were recorded. The end results may contradict traditional P&A methods, but the case history can be used for future reference or potential replication in South East Asia region.\",\"PeriodicalId\":211321,\"journal\":{\"name\":\"Day 2 Wed, December 01, 2021\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-11-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Wed, December 01, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/208473-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, December 01, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/208473-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Low Cost Plug and Abandonment with Hybrid Hydraulic Pulling Unit
Plug and Abandonment (P&A) operations with conventional Hydraulic Workover Unit (WHU) have an enormous benefit and impact on low-cost P&A campaign in Malaysia compare with using conventional drilling rig. Subsequently, this Hybrid Hydraulic Pulling Unit (HHPU) was the first successful deployed and safely delivered for P&A campaign together with conductor removal in offshore West Malaysia.
This paper presents case study that showcase the capability of HHPU for low-cost permanent P&A campaign by eliminate requirement for additional bringing rigging-up and rigging-down of casing jack unit for conductor removal operation. The unit manage to cut and pull-out the existing completion strings, setting cement plugs, cut and pull-out multiple strings of casing along with retrieving the 24″ conductors delivering the most advantageous outcome for P&A campaign safely, efficiently and cost effectively. It was invented from 340K HWU with improvise features that capable of pull-out existing completion string and removal of the conductor with size up to 36″.
This paper demonstrates a unique combination of techniques and equipment of a successfully low-cost P&A operation with excellent client satisfaction with no incident and accident were recorded. The end results may contradict traditional P&A methods, but the case history can be used for future reference or potential replication in South East Asia region.