M. Marwali, H. Ma, S. M. Shahidehpour, K. Abdul-Rahman
{"title":"具有蓄电池储能的光伏电网短期发电调度","authors":"M. Marwali, H. Ma, S. M. Shahidehpour, K. Abdul-Rahman","doi":"10.1109/PICA.1997.599402","DOIUrl":null,"url":null,"abstract":"This paper presents an efficient approach to short-term resource scheduling for an integrated thermal and photovoltaic-battery generation. The proposed model incorporates battery storage for peak load shaving. Several constraints including battery capacity, minimum up/down time and ramp rates for thermal units, as well as natural photovoltaic (PV) capacity are considered in the proposed model. A case study composed of 26 thermal units and a PV-battery plant is presented to test the efficiency of the method.","PeriodicalId":383749,"journal":{"name":"Proceedings of the 20th International Conference on Power Industry Computer Applications","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1997-05-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"138","resultStr":"{\"title\":\"Short term generation scheduling in photovoltaic-utility grid with battery storage\",\"authors\":\"M. Marwali, H. Ma, S. M. Shahidehpour, K. Abdul-Rahman\",\"doi\":\"10.1109/PICA.1997.599402\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents an efficient approach to short-term resource scheduling for an integrated thermal and photovoltaic-battery generation. The proposed model incorporates battery storage for peak load shaving. Several constraints including battery capacity, minimum up/down time and ramp rates for thermal units, as well as natural photovoltaic (PV) capacity are considered in the proposed model. A case study composed of 26 thermal units and a PV-battery plant is presented to test the efficiency of the method.\",\"PeriodicalId\":383749,\"journal\":{\"name\":\"Proceedings of the 20th International Conference on Power Industry Computer Applications\",\"volume\":\"44 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1997-05-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"138\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 20th International Conference on Power Industry Computer Applications\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PICA.1997.599402\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 20th International Conference on Power Industry Computer Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PICA.1997.599402","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Short term generation scheduling in photovoltaic-utility grid with battery storage
This paper presents an efficient approach to short-term resource scheduling for an integrated thermal and photovoltaic-battery generation. The proposed model incorporates battery storage for peak load shaving. Several constraints including battery capacity, minimum up/down time and ramp rates for thermal units, as well as natural photovoltaic (PV) capacity are considered in the proposed model. A case study composed of 26 thermal units and a PV-battery plant is presented to test the efficiency of the method.