考虑光伏输出不确定性的配电站区域最优调度方法研究

H. Xue, Zijia Ding, Zongjie Liu, Yongli Fang, Lulin Meng, Huifen Zhang
{"title":"考虑光伏输出不确定性的配电站区域最优调度方法研究","authors":"H. Xue, Zijia Ding, Zongjie Liu, Yongli Fang, Lulin Meng, Huifen Zhang","doi":"10.1109/CEEPE58418.2023.10167021","DOIUrl":null,"url":null,"abstract":"In this article, the cardinal uncertainty collection is used to describe the uncertainty of photovoltaic (PV) output, and it is introduced into the scheduling optimization problem. Taking the min operation cost as the objective and considering the uncertainty of PV output, a two-phase robust optimization scheduling (ROS) model for the station area is established. The column-and-constraint generation algorithm (C&CGA) is used to decouple it into the main problem and sub-problem to be solved alternately, and the model is solved. Finally, the proposed model is simulated and analyzed by an improved IEEE33 node example. The results show that proposed method can effectively reduce the load fluctuation and operation cost, and reduce the operation loss of the distribution station area.","PeriodicalId":431552,"journal":{"name":"2023 6th International Conference on Energy, Electrical and Power Engineering (CEEPE)","volume":"198 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-05-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research on Optimal Scheduling Method of Distribution Station Area Considering the Uncertainty of Photovoltaic Output\",\"authors\":\"H. Xue, Zijia Ding, Zongjie Liu, Yongli Fang, Lulin Meng, Huifen Zhang\",\"doi\":\"10.1109/CEEPE58418.2023.10167021\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this article, the cardinal uncertainty collection is used to describe the uncertainty of photovoltaic (PV) output, and it is introduced into the scheduling optimization problem. Taking the min operation cost as the objective and considering the uncertainty of PV output, a two-phase robust optimization scheduling (ROS) model for the station area is established. The column-and-constraint generation algorithm (C&CGA) is used to decouple it into the main problem and sub-problem to be solved alternately, and the model is solved. Finally, the proposed model is simulated and analyzed by an improved IEEE33 node example. The results show that proposed method can effectively reduce the load fluctuation and operation cost, and reduce the operation loss of the distribution station area.\",\"PeriodicalId\":431552,\"journal\":{\"name\":\"2023 6th International Conference on Energy, Electrical and Power Engineering (CEEPE)\",\"volume\":\"198 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-05-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2023 6th International Conference on Energy, Electrical and Power Engineering (CEEPE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CEEPE58418.2023.10167021\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2023 6th International Conference on Energy, Electrical and Power Engineering (CEEPE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CEEPE58418.2023.10167021","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文采用基数不确定性集合来描述光伏发电输出的不确定性,并将其引入到调度优化问题中。以运行成本最小为目标,考虑光伏发电出力的不确定性,建立了电站区域的两阶段鲁棒优化调度模型。采用列约束生成算法(C&CGA)将其解耦为待解的主问题和子问题,对模型进行求解。最后,通过改进的IEEE33节点算例对所提模型进行了仿真分析。结果表明,该方法能有效降低负荷波动和运行成本,降低配电站区域的运行损失。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Research on Optimal Scheduling Method of Distribution Station Area Considering the Uncertainty of Photovoltaic Output
In this article, the cardinal uncertainty collection is used to describe the uncertainty of photovoltaic (PV) output, and it is introduced into the scheduling optimization problem. Taking the min operation cost as the objective and considering the uncertainty of PV output, a two-phase robust optimization scheduling (ROS) model for the station area is established. The column-and-constraint generation algorithm (C&CGA) is used to decouple it into the main problem and sub-problem to be solved alternately, and the model is solved. Finally, the proposed model is simulated and analyzed by an improved IEEE33 node example. The results show that proposed method can effectively reduce the load fluctuation and operation cost, and reduce the operation loss of the distribution station area.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信