优化铁路轨道维修调度以减少对流通的影响

P. M. Bueno, P. Vilela, Luciano M. Christofoletti, Anderson P. Vieira
{"title":"优化铁路轨道维修调度以减少对流通的影响","authors":"P. M. Bueno, P. Vilela, Luciano M. Christofoletti, Anderson P. Vieira","doi":"10.1115/JRC2019-1298","DOIUrl":null,"url":null,"abstract":"1 In this paper we present an optimization based technique to allocate time windows for railroad track maintenance in order to minimize the impact on train circulation. The hypothesis is that it is possible to reduce the impact on train circulation if track maintenance slots are scheduled in naturally occurring gaps on the circulation, instead of just using a decision making process that does not take the train circulation into consideration.\n The proposed solution uses simulated annealing as the basis for the algorithm and yields promising results when a random initial placement of track blocks is used. We show the results of our experiments that consider as restrictions the earliest initial time for the track block and the latest termination time for the track blocks (to account for restriction in crew work hours, for example). For this work we do not restrict the number of simultaneous maintenance teams that could be working, future investigations will account for that restriction.","PeriodicalId":287025,"journal":{"name":"2019 Joint Rail Conference","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Optimizing Railway Track Maintenance Scheduling to Minimize Circulation Impacts\",\"authors\":\"P. M. Bueno, P. Vilela, Luciano M. Christofoletti, Anderson P. Vieira\",\"doi\":\"10.1115/JRC2019-1298\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"1 In this paper we present an optimization based technique to allocate time windows for railroad track maintenance in order to minimize the impact on train circulation. The hypothesis is that it is possible to reduce the impact on train circulation if track maintenance slots are scheduled in naturally occurring gaps on the circulation, instead of just using a decision making process that does not take the train circulation into consideration.\\n The proposed solution uses simulated annealing as the basis for the algorithm and yields promising results when a random initial placement of track blocks is used. We show the results of our experiments that consider as restrictions the earliest initial time for the track block and the latest termination time for the track blocks (to account for restriction in crew work hours, for example). For this work we do not restrict the number of simultaneous maintenance teams that could be working, future investigations will account for that restriction.\",\"PeriodicalId\":287025,\"journal\":{\"name\":\"2019 Joint Rail Conference\",\"volume\":\"32 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-07-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 Joint Rail Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1115/JRC2019-1298\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 Joint Rail Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/JRC2019-1298","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

在本文中,我们提出了一种基于优化的技术来分配铁路轨道维修的时间窗,以尽量减少对列车流通的影响。假设是,如果将轨道维修时段安排在交通中自然出现的间隙中,而不是仅仅使用不考虑火车交通的决策过程,就有可能减少对火车交通的影响。所提出的解决方案使用模拟退火作为算法的基础,并在使用随机初始位置的轨道块时产生有希望的结果。我们展示了我们的实验结果,考虑了轨道块的最早初始时间和轨道块的最晚终止时间作为限制(例如,考虑到船员工作时间的限制)。对于这项工作,我们不限制可能同时工作的维护团队的数量,未来的调查将考虑到这一限制。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Optimizing Railway Track Maintenance Scheduling to Minimize Circulation Impacts
1 In this paper we present an optimization based technique to allocate time windows for railroad track maintenance in order to minimize the impact on train circulation. The hypothesis is that it is possible to reduce the impact on train circulation if track maintenance slots are scheduled in naturally occurring gaps on the circulation, instead of just using a decision making process that does not take the train circulation into consideration. The proposed solution uses simulated annealing as the basis for the algorithm and yields promising results when a random initial placement of track blocks is used. We show the results of our experiments that consider as restrictions the earliest initial time for the track block and the latest termination time for the track blocks (to account for restriction in crew work hours, for example). For this work we do not restrict the number of simultaneous maintenance teams that could be working, future investigations will account for that restriction.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信