{"title":"求解不确定总体生产计划问题的模糊多目标规划模型","authors":"H. Mosadegh, E. Khakbazan, A. Salmasnia, H. Mokhtari","doi":"10.1504/IJIDS.2017.10005871","DOIUrl":null,"url":null,"abstract":"The aggregate production planning problem is one of the well-known planning problems in industries and manufacturing systems. It is implemented at an aggregated level without the need to provide detailed information about material and resource requirements for individual products. A multi-objective aggregate production planning problem is studied in current paper with four criteria, namely: 1) shortage and inventory; 2) overtime and idle time; 3) manpower level; 4) currency saving in a mid-term planning horizon. After describing the problem, a goal programming model is presented to formulate the problem mathematically and then a fuzzy goal programming model is utilised to encounter the uncertainties encountered in real-world systems. Unlike many previous works, this paper proposes a linear programming model which is solvable in a short time. Finally, to evaluate the performance, both models are verified with real data.","PeriodicalId":303039,"journal":{"name":"Int. J. Inf. Decis. Sci.","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-07-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"11","resultStr":"{\"title\":\"A fuzzy multi-objective goal programming model for solving an aggregate production planning problem with uncertainty\",\"authors\":\"H. Mosadegh, E. Khakbazan, A. Salmasnia, H. Mokhtari\",\"doi\":\"10.1504/IJIDS.2017.10005871\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The aggregate production planning problem is one of the well-known planning problems in industries and manufacturing systems. It is implemented at an aggregated level without the need to provide detailed information about material and resource requirements for individual products. A multi-objective aggregate production planning problem is studied in current paper with four criteria, namely: 1) shortage and inventory; 2) overtime and idle time; 3) manpower level; 4) currency saving in a mid-term planning horizon. After describing the problem, a goal programming model is presented to formulate the problem mathematically and then a fuzzy goal programming model is utilised to encounter the uncertainties encountered in real-world systems. Unlike many previous works, this paper proposes a linear programming model which is solvable in a short time. Finally, to evaluate the performance, both models are verified with real data.\",\"PeriodicalId\":303039,\"journal\":{\"name\":\"Int. J. Inf. Decis. Sci.\",\"volume\":\"26 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-07-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"11\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Int. J. Inf. Decis. Sci.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/IJIDS.2017.10005871\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Int. J. Inf. Decis. Sci.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJIDS.2017.10005871","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 11

摘要

总体生产计划问题是工业和制造系统中众所周知的计划问题之一。它是在一个聚合的层次上实现的,不需要提供关于单个产品的材料和资源需求的详细信息。本文研究了一个多目标总体生产计划问题,该问题采用四个准则,即:1)短缺和库存;2)加班和空闲时间;3)人力水平;4)中期计划范围内的货币储蓄。在对问题进行描述之后,提出了一个目标规划模型来对问题进行数学表述,然后利用模糊目标规划模型来解决实际系统中遇到的不确定性问题。与以往的许多工作不同,本文提出了一个在短时间内可求解的线性规划模型。最后,用实际数据验证了两种模型的性能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A fuzzy multi-objective goal programming model for solving an aggregate production planning problem with uncertainty
The aggregate production planning problem is one of the well-known planning problems in industries and manufacturing systems. It is implemented at an aggregated level without the need to provide detailed information about material and resource requirements for individual products. A multi-objective aggregate production planning problem is studied in current paper with four criteria, namely: 1) shortage and inventory; 2) overtime and idle time; 3) manpower level; 4) currency saving in a mid-term planning horizon. After describing the problem, a goal programming model is presented to formulate the problem mathematically and then a fuzzy goal programming model is utilised to encounter the uncertainties encountered in real-world systems. Unlike many previous works, this paper proposes a linear programming model which is solvable in a short time. Finally, to evaluate the performance, both models are verified with real data.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信