ERCOT调高和调降运营准备金的分析

J. Andrade, R. Baldick, Yingzhang Dong
{"title":"ERCOT调高和调降运营准备金的分析","authors":"J. Andrade, R. Baldick, Yingzhang Dong","doi":"10.1109/TPEC.2017.7868266","DOIUrl":null,"url":null,"abstract":"The short-term production variability of utility scale renewable generation is compensated for by Operational Reserves. At first sight, it might be expected that the required reserves would increase with the amount of renewable installed power. However, this has not recently been the case in ERCOT, where operational reserves requirements have decreased over time. A closer look reveals that other changes have occurred over time as specified in Nodal Protocol Revision Requests (NPRRs). This paper presents a statistical analysis of the impact of different NPRR changes over ERCOT procured Regulation-Up and Regulation-Down operational reserves. The significance of them was assessed by using the Regression Discontinuity Design method. The results suggest that eventually more renewable generation can be introduced without a significant increasing of operational reserve requirements.","PeriodicalId":391980,"journal":{"name":"2017 IEEE Texas Power and Energy Conference (TPEC)","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Analysis of ERCOT regulation-up and regulation-down operational reserves\",\"authors\":\"J. Andrade, R. Baldick, Yingzhang Dong\",\"doi\":\"10.1109/TPEC.2017.7868266\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The short-term production variability of utility scale renewable generation is compensated for by Operational Reserves. At first sight, it might be expected that the required reserves would increase with the amount of renewable installed power. However, this has not recently been the case in ERCOT, where operational reserves requirements have decreased over time. A closer look reveals that other changes have occurred over time as specified in Nodal Protocol Revision Requests (NPRRs). This paper presents a statistical analysis of the impact of different NPRR changes over ERCOT procured Regulation-Up and Regulation-Down operational reserves. The significance of them was assessed by using the Regression Discontinuity Design method. The results suggest that eventually more renewable generation can be introduced without a significant increasing of operational reserve requirements.\",\"PeriodicalId\":391980,\"journal\":{\"name\":\"2017 IEEE Texas Power and Energy Conference (TPEC)\",\"volume\":\"16 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-02-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 IEEE Texas Power and Energy Conference (TPEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TPEC.2017.7868266\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 IEEE Texas Power and Energy Conference (TPEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TPEC.2017.7868266","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

公用事业规模可再生能源发电的短期生产变异性由运营储备补偿。乍一看,可以预期所需的储备将随着可再生能源装机容量的增加而增加。然而,最近在ERCOT的情况并非如此,其业务储备需求随着时间的推移而减少。仔细观察就会发现,随着时间的推移,节点协议修订请求(NPRRs)中指定的其他变化也发生了。本文对不同的NPRR变化对ERCOT采购的规制- up和规制- down运营储备的影响进行了统计分析。采用回归不连续设计法评价其显著性。结果表明,在不显著增加运行储备需求的情况下,最终可以引入更多的可再生能源发电。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of ERCOT regulation-up and regulation-down operational reserves
The short-term production variability of utility scale renewable generation is compensated for by Operational Reserves. At first sight, it might be expected that the required reserves would increase with the amount of renewable installed power. However, this has not recently been the case in ERCOT, where operational reserves requirements have decreased over time. A closer look reveals that other changes have occurred over time as specified in Nodal Protocol Revision Requests (NPRRs). This paper presents a statistical analysis of the impact of different NPRR changes over ERCOT procured Regulation-Up and Regulation-Down operational reserves. The significance of them was assessed by using the Regression Discontinuity Design method. The results suggest that eventually more renewable generation can be introduced without a significant increasing of operational reserve requirements.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信