500kv直流输电线路带电线路复合空气间隙试验研究

Wang Ruzhang, Hunag Weishu, Yin Goxiang
{"title":"500kv直流输电线路带电线路复合空气间隙试验研究","authors":"Wang Ruzhang, Hunag Weishu, Yin Goxiang","doi":"10.1109/TDCLLM.1995.485055","DOIUrl":null,"url":null,"abstract":"In this paper, the insulation characteristics of composite air clearances of both tension towers and suspension towers for live line working on 500 kV DC transmission lines are introduced. The tests are carried out in two ways. One is to simulate the man riding on the tension insulator strings moving to the conductor side. The other is to simulate the soft ladder carrying a man slipping to the conductor side along the slideway which is mounted on the crossarm. During the test, different working conditions are considered, such as tests with different switching impulse waveforms, the existence of damaged insulators within the string and so on. As a result, the safety and reliability of live line working on 500 kV DC power transmission lines has been confirmed.","PeriodicalId":197796,"journal":{"name":"Proceedings of ESMO'95 - 1995 IEEE 7th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-10-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"A testing research on composite air clearance for live line working on 500 kV DC transmission lines\",\"authors\":\"Wang Ruzhang, Hunag Weishu, Yin Goxiang\",\"doi\":\"10.1109/TDCLLM.1995.485055\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, the insulation characteristics of composite air clearances of both tension towers and suspension towers for live line working on 500 kV DC transmission lines are introduced. The tests are carried out in two ways. One is to simulate the man riding on the tension insulator strings moving to the conductor side. The other is to simulate the soft ladder carrying a man slipping to the conductor side along the slideway which is mounted on the crossarm. During the test, different working conditions are considered, such as tests with different switching impulse waveforms, the existence of damaged insulators within the string and so on. As a result, the safety and reliability of live line working on 500 kV DC power transmission lines has been confirmed.\",\"PeriodicalId\":197796,\"journal\":{\"name\":\"Proceedings of ESMO'95 - 1995 IEEE 7th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1995-10-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of ESMO'95 - 1995 IEEE 7th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDCLLM.1995.485055\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of ESMO'95 - 1995 IEEE 7th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDCLLM.1995.485055","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

介绍了在500kv直流输电线路上工作的火线张力塔和悬索塔复合空气间隙的绝缘特性。测试以两种方式进行。一种是模拟一个人骑在向导体一侧移动的张力绝缘子串上。另一种是模拟软梯,载着一个人沿着安装在横臂上的滑道滑到售票员一侧。在测试过程中,考虑了不同的工作条件,如不同开关脉冲波形的测试,串内是否存在绝缘子损坏等。验证了500kv直流输电线路带电运行的安全性和可靠性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A testing research on composite air clearance for live line working on 500 kV DC transmission lines
In this paper, the insulation characteristics of composite air clearances of both tension towers and suspension towers for live line working on 500 kV DC transmission lines are introduced. The tests are carried out in two ways. One is to simulate the man riding on the tension insulator strings moving to the conductor side. The other is to simulate the soft ladder carrying a man slipping to the conductor side along the slideway which is mounted on the crossarm. During the test, different working conditions are considered, such as tests with different switching impulse waveforms, the existence of damaged insulators within the string and so on. As a result, the safety and reliability of live line working on 500 kV DC power transmission lines has been confirmed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信