{"title":"大型战略水电魁北克变电站控制系统现代化及新技术集成问题","authors":"J. Marciano, B. St-Pierre","doi":"10.1109/TDC.2006.1668632","DOIUrl":null,"url":null,"abstract":"When modernizing strategic substations, control engineering design must factor in substation-specific reliability, maintainability and operability criteria while ensuring continuity of supply. Commissioned in the early 1970s, Hydro-Quebec's 735/315/120-kV Duvernay substation comprises 13 buildings specialized by voltage level of function. Some 80 km of cables carrying sequential event recorder (SER), measurement, alarm and control data had seriously deteriorated as a result of numerous spring floods. Furthermore, the conventional control system was outdated. The facility thus required a major overhaul. In 2001, Hydro-Quebec began the various engineering phases for modernizing Duvernay substation. Several technological alternatives were considered based on such factors as facility reliability and maintainability. Besides explaining the reasons behind the technology selected, this paper deals with implementation issues and solutions chosen to smoothly upgrade the substation from conventional to digital technology","PeriodicalId":123024,"journal":{"name":"2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Control System Modernization and Issues with Integrating New Technology at a Major Strategic Hydro-Quebec Substation\",\"authors\":\"J. Marciano, B. St-Pierre\",\"doi\":\"10.1109/TDC.2006.1668632\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"When modernizing strategic substations, control engineering design must factor in substation-specific reliability, maintainability and operability criteria while ensuring continuity of supply. Commissioned in the early 1970s, Hydro-Quebec's 735/315/120-kV Duvernay substation comprises 13 buildings specialized by voltage level of function. Some 80 km of cables carrying sequential event recorder (SER), measurement, alarm and control data had seriously deteriorated as a result of numerous spring floods. Furthermore, the conventional control system was outdated. The facility thus required a major overhaul. In 2001, Hydro-Quebec began the various engineering phases for modernizing Duvernay substation. Several technological alternatives were considered based on such factors as facility reliability and maintainability. Besides explaining the reasons behind the technology selected, this paper deals with implementation issues and solutions chosen to smoothly upgrade the substation from conventional to digital technology\",\"PeriodicalId\":123024,\"journal\":{\"name\":\"2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition\",\"volume\":\"5 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-05-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDC.2006.1668632\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2006.1668632","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在对战略变电站进行现代化改造时,控制工程设计必须在保证供电连续性的同时,考虑到变电站特有的可靠性、可维护性和可操作性标准。Hydro-Quebec的735/315/120千伏Duvernay变电站于20世纪70年代初投入使用,由13座按电压功能等级专门设计的建筑物组成。承载连续事件记录仪(SER)、测量、报警和控制数据的约80公里电缆由于多次春季洪水而严重恶化。此外,传统的控制系统已经过时。因此,该设施需要进行大修。2001年,魁北克水电公司开始了Duvernay变电站现代化的各个工程阶段。根据设施可靠性和可维护性等因素,考虑了几种技术替代方案。本文除了说明所选技术的原因外,还讨论了为使变电站从传统技术顺利升级为数字技术所选择的实施问题和解决方案
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Control System Modernization and Issues with Integrating New Technology at a Major Strategic Hydro-Quebec Substation
When modernizing strategic substations, control engineering design must factor in substation-specific reliability, maintainability and operability criteria while ensuring continuity of supply. Commissioned in the early 1970s, Hydro-Quebec's 735/315/120-kV Duvernay substation comprises 13 buildings specialized by voltage level of function. Some 80 km of cables carrying sequential event recorder (SER), measurement, alarm and control data had seriously deteriorated as a result of numerous spring floods. Furthermore, the conventional control system was outdated. The facility thus required a major overhaul. In 2001, Hydro-Quebec began the various engineering phases for modernizing Duvernay substation. Several technological alternatives were considered based on such factors as facility reliability and maintainability. Besides explaining the reasons behind the technology selected, this paper deals with implementation issues and solutions chosen to smoothly upgrade the substation from conventional to digital technology
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信