玻璃工程的规划阶段

P. Lenk
{"title":"玻璃工程的规划阶段","authors":"P. Lenk","doi":"10.47982/cgc.8.445","DOIUrl":null,"url":null,"abstract":"This paper showcases the challenges in design, fabrication, and installation of glass projects. The modus operandi of an engineer working with glass is presented and the rationale behind the decisions explained. The first section discusses the motivations in several projects. The life cycle phases of the projects are outlined. The second chapter introduces the importance of conceptual design and generation of options on an all-glass staircase project example. Communication of the design intent is outlined in the third chapter, supported with graphical communication extracted from our recent project of a feature wall and glass elevator. The paper concludes with a brief discussion on procurement and construction phases with primary focus on the recently finished Coal Drops Yard in London. Final remarks on the structural glass design experience are presented in the conclusions.","PeriodicalId":332145,"journal":{"name":"Challenging Glass Conference Proceedings","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-06-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Planning Phases of Glass Projects\",\"authors\":\"P. Lenk\",\"doi\":\"10.47982/cgc.8.445\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper showcases the challenges in design, fabrication, and installation of glass projects. The modus operandi of an engineer working with glass is presented and the rationale behind the decisions explained. The first section discusses the motivations in several projects. The life cycle phases of the projects are outlined. The second chapter introduces the importance of conceptual design and generation of options on an all-glass staircase project example. Communication of the design intent is outlined in the third chapter, supported with graphical communication extracted from our recent project of a feature wall and glass elevator. The paper concludes with a brief discussion on procurement and construction phases with primary focus on the recently finished Coal Drops Yard in London. Final remarks on the structural glass design experience are presented in the conclusions.\",\"PeriodicalId\":332145,\"journal\":{\"name\":\"Challenging Glass Conference Proceedings\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-06-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Challenging Glass Conference Proceedings\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.47982/cgc.8.445\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Challenging Glass Conference Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47982/cgc.8.445","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文展示了玻璃工程在设计、制造和安装方面所面临的挑战。介绍了玻璃工程师的工作方式,并解释了决策背后的基本原理。第一部分讨论了几个项目中的动机。概述了项目的生命周期阶段。第二章以一个全玻璃楼梯项目为例,介绍了概念设计和方案生成的重要性。第三章概述了设计意图的传达,并从我们最近的一个特色墙和玻璃电梯项目中提取了图形传达。本文最后简要讨论了采购和建设阶段,主要集中在最近完成的伦敦煤滴场。最后对结构玻璃的设计经验作了总结。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Planning Phases of Glass Projects
This paper showcases the challenges in design, fabrication, and installation of glass projects. The modus operandi of an engineer working with glass is presented and the rationale behind the decisions explained. The first section discusses the motivations in several projects. The life cycle phases of the projects are outlined. The second chapter introduces the importance of conceptual design and generation of options on an all-glass staircase project example. Communication of the design intent is outlined in the third chapter, supported with graphical communication extracted from our recent project of a feature wall and glass elevator. The paper concludes with a brief discussion on procurement and construction phases with primary focus on the recently finished Coal Drops Yard in London. Final remarks on the structural glass design experience are presented in the conclusions.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信