{"title":"X油田液压抽油机增产的经济性分析","authors":"Muhammad Ariyon, N. Rita, T. Setiawan","doi":"10.5220/0009129401020108","DOIUrl":null,"url":null,"abstract":": The wells of X fields are vertical wells with installed pumps being the Hydraulic Pumping Unit. The wells can still be optimized by improving the performance of N and SL by trial and error method. Based on optimation analysis result at well BM 1 by changing SPM and SL parameters on pump which installed with N 6 SPM and SL 100 inch got Qt equal to 144 bfpd, then converted to N 7 SPM and SL 100 inch so that there increase of Qt become equal to 199 bfpd And pump efficiency from 67% to 80%. While in the well BM 2 by changing the parameters of SPM and SL on pumps installed with N 8 SPM and SL 100 inch obtained Qt of 284 bfpd, then converted to N 10 SPM and SL 110 inch so that there is an increase of Qt to equal to 583 bfpd pump efficiency of 65% to 90%. In the economic analysis with Production Sharing Contract system can be known with non-capital investment of MMUS $ 0.150, obtained NPV contractor MUS $ 451.07, IRR > MARR,POT < 1 year and DPI 4.00.","PeriodicalId":382428,"journal":{"name":"Proceedings of the Second International Conference on Science, Engineering and Technology","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of Economy in the Improvement of Oil Production using Hydraulic Pumping Unit in X Field\",\"authors\":\"Muhammad Ariyon, N. Rita, T. Setiawan\",\"doi\":\"10.5220/0009129401020108\",\"DOIUrl\":null,\"url\":null,\"abstract\":\": The wells of X fields are vertical wells with installed pumps being the Hydraulic Pumping Unit. The wells can still be optimized by improving the performance of N and SL by trial and error method. Based on optimation analysis result at well BM 1 by changing SPM and SL parameters on pump which installed with N 6 SPM and SL 100 inch got Qt equal to 144 bfpd, then converted to N 7 SPM and SL 100 inch so that there increase of Qt become equal to 199 bfpd And pump efficiency from 67% to 80%. While in the well BM 2 by changing the parameters of SPM and SL on pumps installed with N 8 SPM and SL 100 inch obtained Qt of 284 bfpd, then converted to N 10 SPM and SL 110 inch so that there is an increase of Qt to equal to 583 bfpd pump efficiency of 65% to 90%. In the economic analysis with Production Sharing Contract system can be known with non-capital investment of MMUS $ 0.150, obtained NPV contractor MUS $ 451.07, IRR > MARR,POT < 1 year and DPI 4.00.\",\"PeriodicalId\":382428,\"journal\":{\"name\":\"Proceedings of the Second International Conference on Science, Engineering and Technology\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Second International Conference on Science, Engineering and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5220/0009129401020108\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Second International Conference on Science, Engineering and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5220/0009129401020108","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Analysis of Economy in the Improvement of Oil Production using Hydraulic Pumping Unit in X Field
: The wells of X fields are vertical wells with installed pumps being the Hydraulic Pumping Unit. The wells can still be optimized by improving the performance of N and SL by trial and error method. Based on optimation analysis result at well BM 1 by changing SPM and SL parameters on pump which installed with N 6 SPM and SL 100 inch got Qt equal to 144 bfpd, then converted to N 7 SPM and SL 100 inch so that there increase of Qt become equal to 199 bfpd And pump efficiency from 67% to 80%. While in the well BM 2 by changing the parameters of SPM and SL on pumps installed with N 8 SPM and SL 100 inch obtained Qt of 284 bfpd, then converted to N 10 SPM and SL 110 inch so that there is an increase of Qt to equal to 583 bfpd pump efficiency of 65% to 90%. In the economic analysis with Production Sharing Contract system can be known with non-capital investment of MMUS $ 0.150, obtained NPV contractor MUS $ 451.07, IRR > MARR,POT < 1 year and DPI 4.00.