X油田液压抽油机增产的经济性分析

Muhammad Ariyon, N. Rita, T. Setiawan
{"title":"X油田液压抽油机增产的经济性分析","authors":"Muhammad Ariyon, N. Rita, T. Setiawan","doi":"10.5220/0009129401020108","DOIUrl":null,"url":null,"abstract":": The wells of X fields are vertical wells with installed pumps being the Hydraulic Pumping Unit. The wells can still be optimized by improving the performance of N and SL by trial and error method. Based on optimation analysis result at well BM 1 by changing SPM and SL parameters on pump which installed with N 6 SPM and SL 100 inch got Qt equal to 144 bfpd, then converted to N 7 SPM and SL 100 inch so that there increase of Qt become equal to 199 bfpd And pump efficiency from 67% to 80%. While in the well BM 2 by changing the parameters of SPM and SL on pumps installed with N 8 SPM and SL 100 inch obtained Qt of 284 bfpd, then converted to N 10 SPM and SL 110 inch so that there is an increase of Qt to equal to 583 bfpd pump efficiency of 65% to 90%. In the economic analysis with Production Sharing Contract system can be known with non-capital investment of MMUS $ 0.150, obtained NPV contractor MUS $ 451.07, IRR > MARR,POT < 1 year and DPI 4.00.","PeriodicalId":382428,"journal":{"name":"Proceedings of the Second International Conference on Science, Engineering and Technology","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of Economy in the Improvement of Oil Production using Hydraulic Pumping Unit in X Field\",\"authors\":\"Muhammad Ariyon, N. Rita, T. Setiawan\",\"doi\":\"10.5220/0009129401020108\",\"DOIUrl\":null,\"url\":null,\"abstract\":\": The wells of X fields are vertical wells with installed pumps being the Hydraulic Pumping Unit. The wells can still be optimized by improving the performance of N and SL by trial and error method. Based on optimation analysis result at well BM 1 by changing SPM and SL parameters on pump which installed with N 6 SPM and SL 100 inch got Qt equal to 144 bfpd, then converted to N 7 SPM and SL 100 inch so that there increase of Qt become equal to 199 bfpd And pump efficiency from 67% to 80%. While in the well BM 2 by changing the parameters of SPM and SL on pumps installed with N 8 SPM and SL 100 inch obtained Qt of 284 bfpd, then converted to N 10 SPM and SL 110 inch so that there is an increase of Qt to equal to 583 bfpd pump efficiency of 65% to 90%. In the economic analysis with Production Sharing Contract system can be known with non-capital investment of MMUS $ 0.150, obtained NPV contractor MUS $ 451.07, IRR > MARR,POT < 1 year and DPI 4.00.\",\"PeriodicalId\":382428,\"journal\":{\"name\":\"Proceedings of the Second International Conference on Science, Engineering and Technology\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Second International Conference on Science, Engineering and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5220/0009129401020108\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Second International Conference on Science, Engineering and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5220/0009129401020108","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

X油田的井为直井,安装的泵为液压抽油机。通过试错法提高N和SL的性能,仍然可以对井进行优化。根据BM 1井的优化分析结果,通过改变泵的SPM和SL参数,在安装了n6 SPM和SL 100英寸后,Qt为144 bfpd,然后将其转换为n7 SPM和SL 100英寸,Qt增加为199 bfpd,泵效率从67%提高到80%。而在bm2井中,通过改变SPM和SL的参数,在安装了n8 SPM和SL 100英寸的泵上获得了284 bfpd的Qt,然后将其转换为n10 SPM和SL 110英寸,从而将Qt增加到等于583 bfpd,泵效率提高了65%至90%。在生产分成承包制下的经济分析中,可知非资本投资为0.150美元,承包方获得的净现值为451.07美元,IRR > MARR,POT < 1年,DPI为4.00。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of Economy in the Improvement of Oil Production using Hydraulic Pumping Unit in X Field
: The wells of X fields are vertical wells with installed pumps being the Hydraulic Pumping Unit. The wells can still be optimized by improving the performance of N and SL by trial and error method. Based on optimation analysis result at well BM 1 by changing SPM and SL parameters on pump which installed with N 6 SPM and SL 100 inch got Qt equal to 144 bfpd, then converted to N 7 SPM and SL 100 inch so that there increase of Qt become equal to 199 bfpd And pump efficiency from 67% to 80%. While in the well BM 2 by changing the parameters of SPM and SL on pumps installed with N 8 SPM and SL 100 inch obtained Qt of 284 bfpd, then converted to N 10 SPM and SL 110 inch so that there is an increase of Qt to equal to 583 bfpd pump efficiency of 65% to 90%. In the economic analysis with Production Sharing Contract system can be known with non-capital investment of MMUS $ 0.150, obtained NPV contractor MUS $ 451.07, IRR > MARR,POT < 1 year and DPI 4.00.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信