{"title":"超级手臂工作方法【配电线路维护】","authors":"M. Nakagawa, Y. Andoh, K. Nezuka, K. Nakajima","doi":"10.1109/TDCLLM.1995.485048","DOIUrl":null,"url":null,"abstract":"This paper shows the \"Super Arm\" working method which is applied with hot sticks for live-line power distribution line maintenance work. This development study will be projected to future robotics work. The results as described in this paper show a substantial increase in productivity.","PeriodicalId":197796,"journal":{"name":"Proceedings of ESMO'95 - 1995 IEEE 7th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-10-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Super Arm working method [power distribution line maintenance]\",\"authors\":\"M. Nakagawa, Y. Andoh, K. Nezuka, K. Nakajima\",\"doi\":\"10.1109/TDCLLM.1995.485048\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper shows the \\\"Super Arm\\\" working method which is applied with hot sticks for live-line power distribution line maintenance work. This development study will be projected to future robotics work. The results as described in this paper show a substantial increase in productivity.\",\"PeriodicalId\":197796,\"journal\":{\"name\":\"Proceedings of ESMO'95 - 1995 IEEE 7th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance\",\"volume\":\"10 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1995-10-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of ESMO'95 - 1995 IEEE 7th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDCLLM.1995.485048\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of ESMO'95 - 1995 IEEE 7th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDCLLM.1995.485048","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Super Arm working method [power distribution line maintenance]
This paper shows the "Super Arm" working method which is applied with hot sticks for live-line power distribution line maintenance work. This development study will be projected to future robotics work. The results as described in this paper show a substantial increase in productivity.