{"title":"输电网投资不足的成本-案例:北欧电力市场","authors":"M. Makkonen, S. Viljainen","doi":"10.1109/EEM.2012.6254742","DOIUrl":null,"url":null,"abstract":"The Nordic electricity market utilises zonal pricing as its market design. To promote the functioning of the chosen market design, the Nordic transmission system operators have seen the improvement of market uniformity as an important goal in their common grid planning (Nordel's grid plans from 2004 and 2008). Market convergence rate is an often used measure that indicates the hours during which the market actually operates as uniform. However, recent evidence suggests that the targeted market convergence has not been achieved. One reason is that the planned grid investments have not been fully realised. In this paper, we study the impacts of reduced market convergence on the Nordic electricity end-users in 2010. For example, results indicate that the costs of neglecting the grid investments have been approximately 200 and 360 million euros for Finnish and Swedish electricity users, respectively. Similar calculations were also done for Norway and Denmark.","PeriodicalId":383754,"journal":{"name":"2012 9th International Conference on the European Energy Market","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-05-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Costs of insufficient transmission network investments — Case: The Nordic electricity market\",\"authors\":\"M. Makkonen, S. Viljainen\",\"doi\":\"10.1109/EEM.2012.6254742\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Nordic electricity market utilises zonal pricing as its market design. To promote the functioning of the chosen market design, the Nordic transmission system operators have seen the improvement of market uniformity as an important goal in their common grid planning (Nordel's grid plans from 2004 and 2008). Market convergence rate is an often used measure that indicates the hours during which the market actually operates as uniform. However, recent evidence suggests that the targeted market convergence has not been achieved. One reason is that the planned grid investments have not been fully realised. In this paper, we study the impacts of reduced market convergence on the Nordic electricity end-users in 2010. For example, results indicate that the costs of neglecting the grid investments have been approximately 200 and 360 million euros for Finnish and Swedish electricity users, respectively. Similar calculations were also done for Norway and Denmark.\",\"PeriodicalId\":383754,\"journal\":{\"name\":\"2012 9th International Conference on the European Energy Market\",\"volume\":\"21 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-05-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 9th International Conference on the European Energy Market\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EEM.2012.6254742\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 9th International Conference on the European Energy Market","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2012.6254742","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

北欧电力市场采用分区定价作为其市场设计。为了促进所选择的市场设计的功能,北欧输电系统运营商已经将改善市场统一性作为其共同电网规划的重要目标(诺德尔2004年和2008年的电网计划)。市场趋同率是一种常用的指标,用来表示市场实际统一运作的时间。然而,最近的证据表明,目标市场趋同尚未实现。一个原因是计划中的电网投资尚未完全实现。本文研究了2010年市场趋同程度降低对北欧电力终端用户的影响。例如,结果表明,芬兰和瑞典电力用户忽略电网投资的成本分别约为2亿欧元和3.6亿欧元。挪威和丹麦也进行了类似的计算。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Costs of insufficient transmission network investments — Case: The Nordic electricity market
The Nordic electricity market utilises zonal pricing as its market design. To promote the functioning of the chosen market design, the Nordic transmission system operators have seen the improvement of market uniformity as an important goal in their common grid planning (Nordel's grid plans from 2004 and 2008). Market convergence rate is an often used measure that indicates the hours during which the market actually operates as uniform. However, recent evidence suggests that the targeted market convergence has not been achieved. One reason is that the planned grid investments have not been fully realised. In this paper, we study the impacts of reduced market convergence on the Nordic electricity end-users in 2010. For example, results indicate that the costs of neglecting the grid investments have been approximately 200 and 360 million euros for Finnish and Swedish electricity users, respectively. Similar calculations were also done for Norway and Denmark.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信