宁鲁±660kV特高压直流工程晶闸管阀运行试验

G. Tang, K. Zha, J. Wen, C. Gao, X.G. Zhang, G. Wang, David Jackson, J.Z. Cao
{"title":"宁鲁±660kV特高压直流工程晶闸管阀运行试验","authors":"G. Tang, K. Zha, J. Wen, C. Gao, X.G. Zhang, G. Wang, David Jackson, J.Z. Cao","doi":"10.1109/POWERCON.2010.5666020","DOIUrl":null,"url":null,"abstract":"For purchasing more efficiency, more power transmission capacity, UHVDC projects are employed in the gird of China. Thyristor valves, as one of the key equipments, must pass the operational tests in order to make sure the valve design is proper. In coordinate with IEC60700-1 standards and based on thorough investigation and comparison of exiting operational test circuits, a new operational tests circuit is developed and applied in the Ningdong-Shandong ±660kV UHVDC project. In this paper, the topology and working principle of the test circuit are introduced. Then test parameters and results are presented, showing that development of thyristor valves for Ningdong-Shandong UHVDC project is successful.","PeriodicalId":169553,"journal":{"name":"2010 International Conference on Power System Technology","volume":"36 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-12-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Operational tests on thyristor valves for Ningdong-Shandong ±660kV UHVDC project\",\"authors\":\"G. Tang, K. Zha, J. Wen, C. Gao, X.G. Zhang, G. Wang, David Jackson, J.Z. Cao\",\"doi\":\"10.1109/POWERCON.2010.5666020\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"For purchasing more efficiency, more power transmission capacity, UHVDC projects are employed in the gird of China. Thyristor valves, as one of the key equipments, must pass the operational tests in order to make sure the valve design is proper. In coordinate with IEC60700-1 standards and based on thorough investigation and comparison of exiting operational test circuits, a new operational tests circuit is developed and applied in the Ningdong-Shandong ±660kV UHVDC project. In this paper, the topology and working principle of the test circuit are introduced. Then test parameters and results are presented, showing that development of thyristor valves for Ningdong-Shandong UHVDC project is successful.\",\"PeriodicalId\":169553,\"journal\":{\"name\":\"2010 International Conference on Power System Technology\",\"volume\":\"36 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-12-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 International Conference on Power System Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/POWERCON.2010.5666020\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 International Conference on Power System Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/POWERCON.2010.5666020","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

为了获得更高的效率,更大的输电容量,中国电网采用了特高压直流工程。晶闸管阀作为关键设备之一,必须通过运行试验,以保证阀门设计的合理性。配合IEC60700-1标准,在对现有运行试验回路进行深入调研和比较的基础上,开发了一种新的运行试验回路,并应用于宁东-山东±660kV特高压直流工程。本文介绍了测试电路的拓扑结构和工作原理。并给出了试验参数和试验结果,表明该晶闸管阀在宁鲁特高压直流工程中的研制是成功的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Operational tests on thyristor valves for Ningdong-Shandong ±660kV UHVDC project
For purchasing more efficiency, more power transmission capacity, UHVDC projects are employed in the gird of China. Thyristor valves, as one of the key equipments, must pass the operational tests in order to make sure the valve design is proper. In coordinate with IEC60700-1 standards and based on thorough investigation and comparison of exiting operational test circuits, a new operational tests circuit is developed and applied in the Ningdong-Shandong ±660kV UHVDC project. In this paper, the topology and working principle of the test circuit are introduced. Then test parameters and results are presented, showing that development of thyristor valves for Ningdong-Shandong UHVDC project is successful.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信