{"title":"系统排水系统的研究,以解决早晨税务市场地区的雨水流失","authors":"Khairul Anwar","doi":"10.53695/jm.v3i1.643","DOIUrl":null,"url":null,"abstract":"Puddles or floods that occur in an area are caused by a disturbed or malfunctioning drainage system. The research location was conducted in the Kutacane Morning Tax market area. The calculation of the rainfall intensity used for this study is by using the mononobe formula with the parameters for calculating the rainfall value of the Pearson III Log Distribution for a 5-year return period. The Kirpich equation determines the concentration time. From the results of the research, it turns out that the Tax channel in the Morning Tax market is not able to drain puddles of rainwater, which causes puddles in the market area, and the Disposal channel, which is a drainage channel in the market, does not function because it is clogged with sedimentation so that the Tax channel is unable to accommodate and drain high-intensity rainwater discharge. In order to avoid inundation in the morning tax area, the dimensions of the channel are redesigned, where the existing dimensions are the tax channel with dimensions h = 0.65 m, B = 0.85 m, f = 0.15 m, with Q plans (m/ sec) = 1.219 and Q capacity (m/sec) = 0.498 with a description (Does not meet) Meanwhile, the dimensions of the redesigned tax channel are h = 0.781 m, , B = 0.781 m, f = 0.5 m, with Q plans ( m/s) = 1.219 and Q capacity (m/s) = 1.219 with the information (Qualified) the total length of the tax channel is 3,612 Km. For the existing sewer h = 0.65 m, , B = 0.85 m, f = 0.15 m, with a design Q (m/s) = 1.110 and a capacity Q (m/s) = 0.498 with a description (No meet) Meanwhile, the dimensions of the redesigned drain are h = 0.832 m, , B = 832 m, f = 0.5 m, with Q plan (m/sec) = 1,110 and Q capacity (m/sec) = 1,110 with information (Qualified) total length of Exhaust channel 0.421 Km.","PeriodicalId":221886,"journal":{"name":"Jurnal MESIL (Mesin Elektro Sipil)","volume":"435 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Kajian Sistem Jaringan Drainase Guna Menanggulangi Genangan Air Hujan Di Kawasan Pasar Pajak Pagi Kutacane\",\"authors\":\"Khairul Anwar\",\"doi\":\"10.53695/jm.v3i1.643\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Puddles or floods that occur in an area are caused by a disturbed or malfunctioning drainage system. The research location was conducted in the Kutacane Morning Tax market area. The calculation of the rainfall intensity used for this study is by using the mononobe formula with the parameters for calculating the rainfall value of the Pearson III Log Distribution for a 5-year return period. The Kirpich equation determines the concentration time. From the results of the research, it turns out that the Tax channel in the Morning Tax market is not able to drain puddles of rainwater, which causes puddles in the market area, and the Disposal channel, which is a drainage channel in the market, does not function because it is clogged with sedimentation so that the Tax channel is unable to accommodate and drain high-intensity rainwater discharge. In order to avoid inundation in the morning tax area, the dimensions of the channel are redesigned, where the existing dimensions are the tax channel with dimensions h = 0.65 m, B = 0.85 m, f = 0.15 m, with Q plans (m/ sec) = 1.219 and Q capacity (m/sec) = 0.498 with a description (Does not meet) Meanwhile, the dimensions of the redesigned tax channel are h = 0.781 m, , B = 0.781 m, f = 0.5 m, with Q plans ( m/s) = 1.219 and Q capacity (m/s) = 1.219 with the information (Qualified) the total length of the tax channel is 3,612 Km. For the existing sewer h = 0.65 m, , B = 0.85 m, f = 0.15 m, with a design Q (m/s) = 1.110 and a capacity Q (m/s) = 0.498 with a description (No meet) Meanwhile, the dimensions of the redesigned drain are h = 0.832 m, , B = 832 m, f = 0.5 m, with Q plan (m/sec) = 1,110 and Q capacity (m/sec) = 1,110 with information (Qualified) total length of Exhaust channel 0.421 Km.\",\"PeriodicalId\":221886,\"journal\":{\"name\":\"Jurnal MESIL (Mesin Elektro Sipil)\",\"volume\":\"435 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-06-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal MESIL (Mesin Elektro Sipil)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.53695/jm.v3i1.643\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal MESIL (Mesin Elektro Sipil)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53695/jm.v3i1.643","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
一个地区出现的水坑或洪水是由排水系统受到干扰或故障引起的。研究地点在库塔凯恩早税市场区域进行。本研究使用的降雨强度的计算方法是使用单项公式和计算5年回归期Pearson III对数分布的降雨值的参数。Kirpich方程决定了浓度时间。从研究结果来看,早税市场的纳税通道无法排开雨水水坑,导致市场区域出现水坑,而作为市场排水通道的处置通道由于泥沙淤塞而无法发挥作用,导致纳税通道无法容纳和排开高强度的雨水排放。为避免清晨税区淹水,重新设计税道尺寸,现有尺寸为税道尺寸h = 0.65 m, B = 0.85 m, f = 0.15 m, Q平面(m/sec) = 1.219, Q容量(m/sec) = 0.498,并附描述(不满足),同时重新设计税道尺寸为h = 0.781 m,, B = 0.781 m, f = 0.5 m,Q方案(m/s) = 1.219, Q容量(m/s) = 1.219,信息(合格)总长度为3,612 Km。现有排水道h = 0.65 m,, B = 0.85 m, f = 0.15 m,设计Q (m/s) = 1.110,容量Q (m/s) = 0.498,描述为(No meet);重新设计的排水道尺寸h = 0.832 m,, B = 832 m, f = 0.5 m,规划Q (m/sec) = 1110,容量Q (m/sec) = 1110,信息为(Qualified)排气道总长度0.421 Km。
Kajian Sistem Jaringan Drainase Guna Menanggulangi Genangan Air Hujan Di Kawasan Pasar Pajak Pagi Kutacane
Puddles or floods that occur in an area are caused by a disturbed or malfunctioning drainage system. The research location was conducted in the Kutacane Morning Tax market area. The calculation of the rainfall intensity used for this study is by using the mononobe formula with the parameters for calculating the rainfall value of the Pearson III Log Distribution for a 5-year return period. The Kirpich equation determines the concentration time. From the results of the research, it turns out that the Tax channel in the Morning Tax market is not able to drain puddles of rainwater, which causes puddles in the market area, and the Disposal channel, which is a drainage channel in the market, does not function because it is clogged with sedimentation so that the Tax channel is unable to accommodate and drain high-intensity rainwater discharge. In order to avoid inundation in the morning tax area, the dimensions of the channel are redesigned, where the existing dimensions are the tax channel with dimensions h = 0.65 m, B = 0.85 m, f = 0.15 m, with Q plans (m/ sec) = 1.219 and Q capacity (m/sec) = 0.498 with a description (Does not meet) Meanwhile, the dimensions of the redesigned tax channel are h = 0.781 m, , B = 0.781 m, f = 0.5 m, with Q plans ( m/s) = 1.219 and Q capacity (m/s) = 1.219 with the information (Qualified) the total length of the tax channel is 3,612 Km. For the existing sewer h = 0.65 m, , B = 0.85 m, f = 0.15 m, with a design Q (m/s) = 1.110 and a capacity Q (m/s) = 0.498 with a description (No meet) Meanwhile, the dimensions of the redesigned drain are h = 0.832 m, , B = 832 m, f = 0.5 m, with Q plan (m/sec) = 1,110 and Q capacity (m/sec) = 1,110 with information (Qualified) total length of Exhaust channel 0.421 Km.