在BG&E实施自动化采购工程

K.B. Cellars, J. Spina, M.A. Elzey, E. F. McGinn, M. Winsor
{"title":"在BG&E实施自动化采购工程","authors":"K.B. Cellars, J. Spina, M.A. Elzey, E. F. McGinn, M. Winsor","doi":"10.1109/NSSMIC.1992.301421","DOIUrl":null,"url":null,"abstract":"Baltimore Gas and Electric's (BG&E's) approach to implementing an automated procurement engineering process is presented. The process emphasizes part safety classification, procurement specification, and warehouse description standardization, of a limited population of the most frequently procured parts (stocked replacement items for safety-related systems, structures, and components). Logical grouping of over 10000 stock items resulted in consolidation to 275 automated procurement specifications maintained through a PC-based computer application. This automation has resulted in the following cost benefits: reduced procurement engineering staff, reduced procurement request backlog, reduced volume of bid exceptions/deviations, and elimination of duplicate stocked items.<<ETX>>","PeriodicalId":447239,"journal":{"name":"IEEE Conference on Nuclear Science Symposium and Medical Imaging","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1992-10-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Implementing automated procurement engineering at BG&E\",\"authors\":\"K.B. Cellars, J. Spina, M.A. Elzey, E. F. McGinn, M. Winsor\",\"doi\":\"10.1109/NSSMIC.1992.301421\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Baltimore Gas and Electric's (BG&E's) approach to implementing an automated procurement engineering process is presented. The process emphasizes part safety classification, procurement specification, and warehouse description standardization, of a limited population of the most frequently procured parts (stocked replacement items for safety-related systems, structures, and components). Logical grouping of over 10000 stock items resulted in consolidation to 275 automated procurement specifications maintained through a PC-based computer application. This automation has resulted in the following cost benefits: reduced procurement engineering staff, reduced procurement request backlog, reduced volume of bid exceptions/deviations, and elimination of duplicate stocked items.<<ETX>>\",\"PeriodicalId\":447239,\"journal\":{\"name\":\"IEEE Conference on Nuclear Science Symposium and Medical Imaging\",\"volume\":\"41 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1992-10-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE Conference on Nuclear Science Symposium and Medical Imaging\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/NSSMIC.1992.301421\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Conference on Nuclear Science Symposium and Medical Imaging","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/NSSMIC.1992.301421","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

介绍了巴尔的摩燃气和电气公司(BG&E)实施自动化采购工程流程的方法。该过程强调部件安全分类、采购规范和仓库描述标准化,以及有限数量的最频繁采购的部件(与安全相关的系统、结构和组件的库存替换项目)。对1万多件库存物品进行逻辑分组后,通过基于个人电脑的计算机应用程序将其合并为275项自动采购规范。这种自动化带来了以下成本效益:减少了采购工程人员,减少了采购请求积压,减少了投标例外/偏差的数量,并消除了重复的库存物品
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Implementing automated procurement engineering at BG&E
Baltimore Gas and Electric's (BG&E's) approach to implementing an automated procurement engineering process is presented. The process emphasizes part safety classification, procurement specification, and warehouse description standardization, of a limited population of the most frequently procured parts (stocked replacement items for safety-related systems, structures, and components). Logical grouping of over 10000 stock items resulted in consolidation to 275 automated procurement specifications maintained through a PC-based computer application. This automation has resulted in the following cost benefits: reduced procurement engineering staff, reduced procurement request backlog, reduced volume of bid exceptions/deviations, and elimination of duplicate stocked items.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信