多目标柔性作业车间调度问题的比较研究

Yi Feng, Ya-Tai Lin, Mingliang Wu, Dongsheng Yang, Zhile Yang
{"title":"多目标柔性作业车间调度问题的比较研究","authors":"Yi Feng, Ya-Tai Lin, Mingliang Wu, Dongsheng Yang, Zhile Yang","doi":"10.1109/acait53529.2021.9731252","DOIUrl":null,"url":null,"abstract":"Flexible job shop scheduling problem (FJSP) has always been a pivotal research content in the manufacture field. However, many studies only focus on the maximum completion time. The growing demand for development urgently needs a FJSP that can cover a variety of optimization goals. As a result, a multi-objective FJSP model is proposed, which includes four optimization objectives: maximum completion time, total energy depletion, delay time and total machine load. For the multi-objective FJSP, three optimization algorithms of NSGA-II, NSGA-III and MOEA/D are used to minimize the maximum completion time, total energy depletion, delay time and total machine load. The superiority and validity of these algorithms are verified by tests.","PeriodicalId":173633,"journal":{"name":"2021 5th Asian Conference on Artificial Intelligence Technology (ACAIT)","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-10-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Comparative Study of Multi-objective Flexible Job-shop Scheduling Problem\",\"authors\":\"Yi Feng, Ya-Tai Lin, Mingliang Wu, Dongsheng Yang, Zhile Yang\",\"doi\":\"10.1109/acait53529.2021.9731252\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Flexible job shop scheduling problem (FJSP) has always been a pivotal research content in the manufacture field. However, many studies only focus on the maximum completion time. The growing demand for development urgently needs a FJSP that can cover a variety of optimization goals. As a result, a multi-objective FJSP model is proposed, which includes four optimization objectives: maximum completion time, total energy depletion, delay time and total machine load. For the multi-objective FJSP, three optimization algorithms of NSGA-II, NSGA-III and MOEA/D are used to minimize the maximum completion time, total energy depletion, delay time and total machine load. The superiority and validity of these algorithms are verified by tests.\",\"PeriodicalId\":173633,\"journal\":{\"name\":\"2021 5th Asian Conference on Artificial Intelligence Technology (ACAIT)\",\"volume\":\"28 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-10-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 5th Asian Conference on Artificial Intelligence Technology (ACAIT)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/acait53529.2021.9731252\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 5th Asian Conference on Artificial Intelligence Technology (ACAIT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/acait53529.2021.9731252","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

柔性作业车间调度问题(FJSP)一直是制造领域的一个关键研究内容。然而,许多研究只关注最大完成时间。不断增长的开发需求迫切需要一个能够涵盖各种优化目标的FJSP。在此基础上,提出了一个多目标FJSP模型,该模型包含最大完工时间、总能耗、延迟时间和机器总负荷四个优化目标。对于多目标FJSP,采用NSGA-II、NSGA-III和MOEA/D三种优化算法,最大完成时间、总能量消耗、延迟时间和机器总负载最小。通过实验验证了这些算法的优越性和有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A Comparative Study of Multi-objective Flexible Job-shop Scheduling Problem
Flexible job shop scheduling problem (FJSP) has always been a pivotal research content in the manufacture field. However, many studies only focus on the maximum completion time. The growing demand for development urgently needs a FJSP that can cover a variety of optimization goals. As a result, a multi-objective FJSP model is proposed, which includes four optimization objectives: maximum completion time, total energy depletion, delay time and total machine load. For the multi-objective FJSP, three optimization algorithms of NSGA-II, NSGA-III and MOEA/D are used to minimize the maximum completion time, total energy depletion, delay time and total machine load. The superiority and validity of these algorithms are verified by tests.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信