Yi Feng, Ya-Tai Lin, Mingliang Wu, Dongsheng Yang, Zhile Yang
{"title":"多目标柔性作业车间调度问题的比较研究","authors":"Yi Feng, Ya-Tai Lin, Mingliang Wu, Dongsheng Yang, Zhile Yang","doi":"10.1109/acait53529.2021.9731252","DOIUrl":null,"url":null,"abstract":"Flexible job shop scheduling problem (FJSP) has always been a pivotal research content in the manufacture field. However, many studies only focus on the maximum completion time. The growing demand for development urgently needs a FJSP that can cover a variety of optimization goals. As a result, a multi-objective FJSP model is proposed, which includes four optimization objectives: maximum completion time, total energy depletion, delay time and total machine load. For the multi-objective FJSP, three optimization algorithms of NSGA-II, NSGA-III and MOEA/D are used to minimize the maximum completion time, total energy depletion, delay time and total machine load. The superiority and validity of these algorithms are verified by tests.","PeriodicalId":173633,"journal":{"name":"2021 5th Asian Conference on Artificial Intelligence Technology (ACAIT)","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-10-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Comparative Study of Multi-objective Flexible Job-shop Scheduling Problem\",\"authors\":\"Yi Feng, Ya-Tai Lin, Mingliang Wu, Dongsheng Yang, Zhile Yang\",\"doi\":\"10.1109/acait53529.2021.9731252\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Flexible job shop scheduling problem (FJSP) has always been a pivotal research content in the manufacture field. However, many studies only focus on the maximum completion time. The growing demand for development urgently needs a FJSP that can cover a variety of optimization goals. As a result, a multi-objective FJSP model is proposed, which includes four optimization objectives: maximum completion time, total energy depletion, delay time and total machine load. For the multi-objective FJSP, three optimization algorithms of NSGA-II, NSGA-III and MOEA/D are used to minimize the maximum completion time, total energy depletion, delay time and total machine load. The superiority and validity of these algorithms are verified by tests.\",\"PeriodicalId\":173633,\"journal\":{\"name\":\"2021 5th Asian Conference on Artificial Intelligence Technology (ACAIT)\",\"volume\":\"28 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-10-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 5th Asian Conference on Artificial Intelligence Technology (ACAIT)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/acait53529.2021.9731252\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 5th Asian Conference on Artificial Intelligence Technology (ACAIT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/acait53529.2021.9731252","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A Comparative Study of Multi-objective Flexible Job-shop Scheduling Problem
Flexible job shop scheduling problem (FJSP) has always been a pivotal research content in the manufacture field. However, many studies only focus on the maximum completion time. The growing demand for development urgently needs a FJSP that can cover a variety of optimization goals. As a result, a multi-objective FJSP model is proposed, which includes four optimization objectives: maximum completion time, total energy depletion, delay time and total machine load. For the multi-objective FJSP, three optimization algorithms of NSGA-II, NSGA-III and MOEA/D are used to minimize the maximum completion time, total energy depletion, delay time and total machine load. The superiority and validity of these algorithms are verified by tests.