巴西基础设施建设公司增值活动水平——9个案例研究

Bernardo Etges
{"title":"巴西基础设施建设公司增值活动水平——9个案例研究","authors":"Bernardo Etges","doi":"10.24928/2018/0252","DOIUrl":null,"url":null,"abstract":"This paper presents an approach to answer the question of what is the level of valueadding activities that infrastructure projects usually operates. Considering the Lean Construction concepts, waste definitions and Value Stream Mapping, added to an Operational Excellence perspective, the paper bring the result of nine infrastructure projects conducted by a consultancy company in seven Brazilian Construction Companies. In the presented analysis, eight projects took place in Brazil and one in Trinidad and Tobago. The methodological analysis here presented consists of two standard phases of the referred consultancy projects where on-site and data analysis, construction value stream mapping, and “gemba-walk” are used to understand the project and quantify the level of value-adding activities and wastes in the construction process. The Multi Moment Analysis will be used to measure wastes and value added in operations performed on-site. The results show a low level of value-adding activities, representing, in the general analysis, 26% percent of the total available time. The results are also divided for project and type of operation, i.e. earthworks, steel assembly, pre-fab, for example. That analysis brings the possibility to understand specifics characteristics of each project product and different approaches towards planning and production control and a new managing attitude in each company. This understanding was hold in those construction companies and may be a great improvement opportunity for the infrastructure construction sector.","PeriodicalId":419313,"journal":{"name":"26th Annual Conference of the International Group for Lean Construction","volume":"298 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-07-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Value-Adding Activities Level in Brazilian Infrastructure Construction Companies - 9 Cases Study\",\"authors\":\"Bernardo Etges\",\"doi\":\"10.24928/2018/0252\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents an approach to answer the question of what is the level of valueadding activities that infrastructure projects usually operates. Considering the Lean Construction concepts, waste definitions and Value Stream Mapping, added to an Operational Excellence perspective, the paper bring the result of nine infrastructure projects conducted by a consultancy company in seven Brazilian Construction Companies. In the presented analysis, eight projects took place in Brazil and one in Trinidad and Tobago. The methodological analysis here presented consists of two standard phases of the referred consultancy projects where on-site and data analysis, construction value stream mapping, and “gemba-walk” are used to understand the project and quantify the level of value-adding activities and wastes in the construction process. The Multi Moment Analysis will be used to measure wastes and value added in operations performed on-site. The results show a low level of value-adding activities, representing, in the general analysis, 26% percent of the total available time. The results are also divided for project and type of operation, i.e. earthworks, steel assembly, pre-fab, for example. That analysis brings the possibility to understand specifics characteristics of each project product and different approaches towards planning and production control and a new managing attitude in each company. This understanding was hold in those construction companies and may be a great improvement opportunity for the infrastructure construction sector.\",\"PeriodicalId\":419313,\"journal\":{\"name\":\"26th Annual Conference of the International Group for Lean Construction\",\"volume\":\"298 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-07-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"26th Annual Conference of the International Group for Lean Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24928/2018/0252\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"26th Annual Conference of the International Group for Lean Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24928/2018/0252","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

本文提出了一种方法来回答基础设施项目通常运作的增值活动的水平。考虑到精益建设的概念,浪费的定义和价值流映射,加上卓越运营的观点,本文带来了由一家咨询公司在七家巴西建筑公司进行的九个基础设施项目的结果。在提出的分析中,巴西有八个项目,特立尼达和多巴哥有一个项目。这里提出的方法分析包括所提到的咨询项目的两个标准阶段,其中现场和数据分析、施工价值流映射和“gemba-walk”用于了解项目并量化施工过程中增值活动和浪费的水平。多矩分析将用于测量现场作业中的浪费和增值。结果显示了低水平的增值活动,在一般分析中,仅占总可用时间的26%。结果也分为项目和操作类型,即土方工程,钢铁组装,预制,例如。这种分析使我们有可能了解每个项目产品的具体特点,以及每个公司在计划和生产控制方面的不同方法,以及一种新的管理态度。这些建筑公司都有这样的认识,这对基础设施建设行业来说可能是一个很大的改进机会。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Value-Adding Activities Level in Brazilian Infrastructure Construction Companies - 9 Cases Study
This paper presents an approach to answer the question of what is the level of valueadding activities that infrastructure projects usually operates. Considering the Lean Construction concepts, waste definitions and Value Stream Mapping, added to an Operational Excellence perspective, the paper bring the result of nine infrastructure projects conducted by a consultancy company in seven Brazilian Construction Companies. In the presented analysis, eight projects took place in Brazil and one in Trinidad and Tobago. The methodological analysis here presented consists of two standard phases of the referred consultancy projects where on-site and data analysis, construction value stream mapping, and “gemba-walk” are used to understand the project and quantify the level of value-adding activities and wastes in the construction process. The Multi Moment Analysis will be used to measure wastes and value added in operations performed on-site. The results show a low level of value-adding activities, representing, in the general analysis, 26% percent of the total available time. The results are also divided for project and type of operation, i.e. earthworks, steel assembly, pre-fab, for example. That analysis brings the possibility to understand specifics characteristics of each project product and different approaches towards planning and production control and a new managing attitude in each company. This understanding was hold in those construction companies and may be a great improvement opportunity for the infrastructure construction sector.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信