库台巴拉特重型设备公司在库存管理中实施定期审查-可变订单数量制度的案例研究

Anggi Febrianto, T. D. Sofianti, G. Baskoro
{"title":"库台巴拉特重型设备公司在库存管理中实施定期审查-可变订单数量制度的案例研究","authors":"Anggi Febrianto, T. D. Sofianti, G. Baskoro","doi":"10.1145/3557738.3557740","DOIUrl":null,"url":null,"abstract":"One of the processes to minimize downtime unit is the availability of good spare parts. In this study, we will discuss how the process of developing reorder quantity procedures in order to get the availability of spare parts is quite good. in this study, the desired goal is the result of the researcher at 90%. The DMAIC method is used in this study to improve the existing processes in the reordering point. Periodic review with demand fluctuations, vendors holding stock, and inspection programs is an implementation carried out in the inventory process in order to get the availability of slow-moving spare parts, fast-moving spare parts, and spare parts that are monitored for damage. The results obtained are reordering quantity using Inspection which contributes 13% and casting using holding stock vendors based on customer brainstorming contributed 38% while the forgetfulness made by the distributor with periodic review modeling system contributed 43% so the accuracy of the prediction in January was 94% this support is greater than 2021, which is 88%, so there is an increase of 6% and a reduction in the delay time for repairs from 2021, the average order delay is 5.5 days to an order delay of 3.9 days.","PeriodicalId":178760,"journal":{"name":"Proceedings of the 2022 International Conference on Engineering and Information Technology for Sustainable Industry","volume":"37 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-09-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"IMPLEMENTING PERIODIC REVIEW – VARIABLE ORDER QUANTITY SYSTEM IN INVENTORY MANAGEMENT: A CASE STUDY HEAVY EQUIPMENT COMPANIES, KUTAI BARAT\",\"authors\":\"Anggi Febrianto, T. D. Sofianti, G. Baskoro\",\"doi\":\"10.1145/3557738.3557740\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"One of the processes to minimize downtime unit is the availability of good spare parts. In this study, we will discuss how the process of developing reorder quantity procedures in order to get the availability of spare parts is quite good. in this study, the desired goal is the result of the researcher at 90%. The DMAIC method is used in this study to improve the existing processes in the reordering point. Periodic review with demand fluctuations, vendors holding stock, and inspection programs is an implementation carried out in the inventory process in order to get the availability of slow-moving spare parts, fast-moving spare parts, and spare parts that are monitored for damage. The results obtained are reordering quantity using Inspection which contributes 13% and casting using holding stock vendors based on customer brainstorming contributed 38% while the forgetfulness made by the distributor with periodic review modeling system contributed 43% so the accuracy of the prediction in January was 94% this support is greater than 2021, which is 88%, so there is an increase of 6% and a reduction in the delay time for repairs from 2021, the average order delay is 5.5 days to an order delay of 3.9 days.\",\"PeriodicalId\":178760,\"journal\":{\"name\":\"Proceedings of the 2022 International Conference on Engineering and Information Technology for Sustainable Industry\",\"volume\":\"37 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-09-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 2022 International Conference on Engineering and Information Technology for Sustainable Industry\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/3557738.3557740\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2022 International Conference on Engineering and Information Technology for Sustainable Industry","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3557738.3557740","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

最大限度地减少停机时间的方法之一是提供良好的备件。在本研究中,我们将讨论如何制定再订购数量程序,以获得备件的可用性是相当好的。在这项研究中,期望的目标是研究人员在90%的结果。本研究采用DMAIC方法对重排序点的现有流程进行改进。定期审查需求波动,供应商持有库存和检查程序是在库存过程中进行的一项实施,以获得慢速备件,快速备件和监测损坏的备件的可用性。所获得的结果是,使用Inspection重新订购数量贡献了13%,使用holding stock供应商基于客户头脑风暴贡献了38%,而分销商使用定期审查建模系统造成的遗忘贡献了43%,因此1月份预测的准确性为94%,这一支持大于2021年的88%,因此从2021年起,维修延迟时间增加了6%,减少了。平均订单延迟为5.5天至3.9天。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
IMPLEMENTING PERIODIC REVIEW – VARIABLE ORDER QUANTITY SYSTEM IN INVENTORY MANAGEMENT: A CASE STUDY HEAVY EQUIPMENT COMPANIES, KUTAI BARAT
One of the processes to minimize downtime unit is the availability of good spare parts. In this study, we will discuss how the process of developing reorder quantity procedures in order to get the availability of spare parts is quite good. in this study, the desired goal is the result of the researcher at 90%. The DMAIC method is used in this study to improve the existing processes in the reordering point. Periodic review with demand fluctuations, vendors holding stock, and inspection programs is an implementation carried out in the inventory process in order to get the availability of slow-moving spare parts, fast-moving spare parts, and spare parts that are monitored for damage. The results obtained are reordering quantity using Inspection which contributes 13% and casting using holding stock vendors based on customer brainstorming contributed 38% while the forgetfulness made by the distributor with periodic review modeling system contributed 43% so the accuracy of the prediction in January was 94% this support is greater than 2021, which is 88%, so there is an increase of 6% and a reduction in the delay time for repairs from 2021, the average order delay is 5.5 days to an order delay of 3.9 days.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信