{"title":"660mw Deriner大坝工程进气口改进设计","authors":"E. Tanriverdi, M. Balissat, J. Boillat","doi":"10.1201/9781003078722-68","DOIUrl":null,"url":null,"abstract":"Note: [327] Reference LCH-CONF-2001-018 Record created on 2007-04-24, modified on 2016-08-08","PeriodicalId":357593,"journal":{"name":"Hydropower in the New Millennium","volume":"64 1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Modified design of the power intake at the 660 MW Deriner Dam Project\",\"authors\":\"E. Tanriverdi, M. Balissat, J. Boillat\",\"doi\":\"10.1201/9781003078722-68\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Note: [327] Reference LCH-CONF-2001-018 Record created on 2007-04-24, modified on 2016-08-08\",\"PeriodicalId\":357593,\"journal\":{\"name\":\"Hydropower in the New Millennium\",\"volume\":\"64 1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Hydropower in the New Millennium\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1201/9781003078722-68\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Hydropower in the New Millennium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1201/9781003078722-68","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}