Karachaganak统一行动小组- KUAT跨职能协作之旅

Arman Shantayev, Ulan Burkitov, Y. Volokitin, P. Dalmasso, A. Brancolini, M. Durekovic, Bolat Zhumabayev, Muratbek Aibazarov, Indira Kaziyeva, Beibit Bissakayev, Tanat Sultanov, Aidyn Kartamyssov, Alimzhan Adilbayev, Medet Shalabayev
{"title":"Karachaganak统一行动小组- KUAT跨职能协作之旅","authors":"Arman Shantayev, Ulan Burkitov, Y. Volokitin, P. Dalmasso, A. Brancolini, M. Durekovic, Bolat Zhumabayev, Muratbek Aibazarov, Indira Kaziyeva, Beibit Bissakayev, Tanat Sultanov, Aidyn Kartamyssov, Alimzhan Adilbayev, Medet Shalabayev","doi":"10.2118/212053-ms","DOIUrl":null,"url":null,"abstract":"\n Karachaganak is one of the world's largest oil and gas condensate fields in a deep heterogeneous carbonate reservoir with complex sour fluid system located in Western Kazakhstan. Karachaganak's estimated reserves are over 2.4 Bln bbls of condensate and 16 tcf of gas. The asset is co-operated by Shell and Eni through Karachaganak Petroleum Operating (KPO) b.v. Joint Venture.\n KPO successfully deployed a new KUAT operating center with aim to maximize production and improve collaboration among key functional groups managing day-to-day field activities. Maximizing oil production means getting the most condensate liquids to surface at a given gas (or other) constraints by routing producer wells through the network to arrive at the lowest field GOR. Experience showed that the key success factor was to establish a collaboration between Subsurface and Production departments built upon common understanding of field data. Physical embodiment of this collaboration is the Karachaganak Unified Action Team – KUAT, which means \"power\" in Kazakh. This center was established in 2020 with physical placement of Petroleum Engineers together with Production, Process and Planning Engineers in one Operating Center at the field site.\n The objectives of KUAT team include the following short-term integrated activities:\n Daily well line-up optimization as per integrated limit diagram views Integrated activity planning – e.g. optimized start-up of the new wells and projects Well surveillance planning and execution – from reference plans, EBS and opportunity-based GOR management Flow assurance\n KUAT team utilizes the industry standard digital solutions like PI and PI vision and Petex type of solvers as well as custom-made integrators like Data Integrator and Network Optimizer (DINO). In order to ensure that production is always maximized and potential downtime is minimized a robust understanding of the limit diagrams and well potentials is required. This information is provided by live integrated dashboards which include the real-time data from subsurface to export routes. The overall contribution from KUAT is estimated at ~7,000 BOPD or 3% of incremental field production.\n This paper will cover the overview of KUAT journey from early concept development to current state explaining how this center operates today. Workflows and improvements are included in the discussion as well as challenges faced throughout the implementation of newly developed team within the organization","PeriodicalId":394241,"journal":{"name":"Day 1 Tue, November 15, 2022","volume":"83 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-11-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Karachaganak Unified Action Team – KUAT Journey to Cross-Functional Collaboration\",\"authors\":\"Arman Shantayev, Ulan Burkitov, Y. Volokitin, P. Dalmasso, A. Brancolini, M. Durekovic, Bolat Zhumabayev, Muratbek Aibazarov, Indira Kaziyeva, Beibit Bissakayev, Tanat Sultanov, Aidyn Kartamyssov, Alimzhan Adilbayev, Medet Shalabayev\",\"doi\":\"10.2118/212053-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Karachaganak is one of the world's largest oil and gas condensate fields in a deep heterogeneous carbonate reservoir with complex sour fluid system located in Western Kazakhstan. Karachaganak's estimated reserves are over 2.4 Bln bbls of condensate and 16 tcf of gas. The asset is co-operated by Shell and Eni through Karachaganak Petroleum Operating (KPO) b.v. Joint Venture.\\n KPO successfully deployed a new KUAT operating center with aim to maximize production and improve collaboration among key functional groups managing day-to-day field activities. Maximizing oil production means getting the most condensate liquids to surface at a given gas (or other) constraints by routing producer wells through the network to arrive at the lowest field GOR. Experience showed that the key success factor was to establish a collaboration between Subsurface and Production departments built upon common understanding of field data. Physical embodiment of this collaboration is the Karachaganak Unified Action Team – KUAT, which means \\\"power\\\" in Kazakh. This center was established in 2020 with physical placement of Petroleum Engineers together with Production, Process and Planning Engineers in one Operating Center at the field site.\\n The objectives of KUAT team include the following short-term integrated activities:\\n Daily well line-up optimization as per integrated limit diagram views Integrated activity planning – e.g. optimized start-up of the new wells and projects Well surveillance planning and execution – from reference plans, EBS and opportunity-based GOR management Flow assurance\\n KUAT team utilizes the industry standard digital solutions like PI and PI vision and Petex type of solvers as well as custom-made integrators like Data Integrator and Network Optimizer (DINO). In order to ensure that production is always maximized and potential downtime is minimized a robust understanding of the limit diagrams and well potentials is required. This information is provided by live integrated dashboards which include the real-time data from subsurface to export routes. The overall contribution from KUAT is estimated at ~7,000 BOPD or 3% of incremental field production.\\n This paper will cover the overview of KUAT journey from early concept development to current state explaining how this center operates today. Workflows and improvements are included in the discussion as well as challenges faced throughout the implementation of newly developed team within the organization\",\"PeriodicalId\":394241,\"journal\":{\"name\":\"Day 1 Tue, November 15, 2022\",\"volume\":\"83 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-11-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 1 Tue, November 15, 2022\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/212053-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Tue, November 15, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/212053-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

Karachaganak是世界上最大的油气凝析油田之一,位于哈萨克斯坦西部一个具有复杂酸性流体系统的深层非均质碳酸盐岩储层中。据估计,Karachaganak的凝析油储量超过24亿桶,天然气储量超过16万亿立方英尺。该资产由壳牌和埃尼通过Karachaganak石油运营(KPO) b.v.合资企业合作运营。KPO成功部署了一个新的KUAT运营中心,旨在最大限度地提高产量,并改善管理日常现场活动的关键职能小组之间的协作。最大限度地提高石油产量意味着在给定的天然气(或其他)限制条件下,通过将生产井穿过网络,达到最低的油田GOR,从而获得最多的凝析液。经验表明,成功的关键因素是在对现场数据的共同理解的基础上,建立地下部门和生产部门之间的协作。这种合作的具体体现是卡拉恰加纳克统一行动小组- KUAT,在哈萨克语中是“权力”的意思。该中心成立于2020年,将石油工程师与生产、工艺和计划工程师一起安置在现场的一个操作中心。KUAT团队的目标包括以下短期综合活动:综合活动规划,如优化新井的启动和项目的井监测规划和执行,包括参考计划、EBS和基于机会的GOR管理。流量保证KUAT团队利用行业标准的数字解决方案,如PI和PI vision, Petex类型的求解器,以及定制的集成商,如数据集成商和网络优化器(DINO)。为了确保产量最大化和潜在停机时间最小化,需要对极限图和井势有充分的了解。这些信息由实时集成仪表板提供,其中包括从地下到出口路线的实时数据。据估计,KUAT的总体贡献约为7000桶/天,占油田增量产量的3%。本文将概述KUAT从早期概念发展到当前状态的历程,并解释该中心今天如何运作。工作流程和改进包括在讨论中,以及在组织内新开发的团队的整个实现过程中所面临的挑战
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Karachaganak Unified Action Team – KUAT Journey to Cross-Functional Collaboration
Karachaganak is one of the world's largest oil and gas condensate fields in a deep heterogeneous carbonate reservoir with complex sour fluid system located in Western Kazakhstan. Karachaganak's estimated reserves are over 2.4 Bln bbls of condensate and 16 tcf of gas. The asset is co-operated by Shell and Eni through Karachaganak Petroleum Operating (KPO) b.v. Joint Venture. KPO successfully deployed a new KUAT operating center with aim to maximize production and improve collaboration among key functional groups managing day-to-day field activities. Maximizing oil production means getting the most condensate liquids to surface at a given gas (or other) constraints by routing producer wells through the network to arrive at the lowest field GOR. Experience showed that the key success factor was to establish a collaboration between Subsurface and Production departments built upon common understanding of field data. Physical embodiment of this collaboration is the Karachaganak Unified Action Team – KUAT, which means "power" in Kazakh. This center was established in 2020 with physical placement of Petroleum Engineers together with Production, Process and Planning Engineers in one Operating Center at the field site. The objectives of KUAT team include the following short-term integrated activities: Daily well line-up optimization as per integrated limit diagram views Integrated activity planning – e.g. optimized start-up of the new wells and projects Well surveillance planning and execution – from reference plans, EBS and opportunity-based GOR management Flow assurance KUAT team utilizes the industry standard digital solutions like PI and PI vision and Petex type of solvers as well as custom-made integrators like Data Integrator and Network Optimizer (DINO). In order to ensure that production is always maximized and potential downtime is minimized a robust understanding of the limit diagrams and well potentials is required. This information is provided by live integrated dashboards which include the real-time data from subsurface to export routes. The overall contribution from KUAT is estimated at ~7,000 BOPD or 3% of incremental field production. This paper will cover the overview of KUAT journey from early concept development to current state explaining how this center operates today. Workflows and improvements are included in the discussion as well as challenges faced throughout the implementation of newly developed team within the organization
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信