E. Rodrigues, G. Osório, J. Lujano-Rojas, J. Matias, J. Catalão
{"title":"孤岛电力系统储能系统调度管理新方法","authors":"E. Rodrigues, G. Osório, J. Lujano-Rojas, J. Matias, J. Catalão","doi":"10.1109/SEGE.2015.7324577","DOIUrl":null,"url":null,"abstract":"This paper presents an algorithm for integrating and managing electrochemical energy storage systems (ESSs) on unit commitment (UC) problem. As some elements required for integrating electrochemical ESS, such as the power converter, have non-linear characteristics, its corresponding linear modeling could be difficult to be developed and included on the UC problem, which could lead to unfeasible solutions or unexpected results. In order to incorporate full models of ESS and its interface with the power system, in this paper an algorithm to incorporate electrochemical ESS management on the UC problem is presented. An insular power system of 10-units is analyzed, and conclusions are duly drawn.","PeriodicalId":409488,"journal":{"name":"2015 IEEE International Conference on Smart Energy Grid Engineering (SEGE)","volume":"33 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"New schedule management approach of energy storage system in insular power system\",\"authors\":\"E. Rodrigues, G. Osório, J. Lujano-Rojas, J. Matias, J. Catalão\",\"doi\":\"10.1109/SEGE.2015.7324577\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents an algorithm for integrating and managing electrochemical energy storage systems (ESSs) on unit commitment (UC) problem. As some elements required for integrating electrochemical ESS, such as the power converter, have non-linear characteristics, its corresponding linear modeling could be difficult to be developed and included on the UC problem, which could lead to unfeasible solutions or unexpected results. In order to incorporate full models of ESS and its interface with the power system, in this paper an algorithm to incorporate electrochemical ESS management on the UC problem is presented. An insular power system of 10-units is analyzed, and conclusions are duly drawn.\",\"PeriodicalId\":409488,\"journal\":{\"name\":\"2015 IEEE International Conference on Smart Energy Grid Engineering (SEGE)\",\"volume\":\"33 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-11-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 IEEE International Conference on Smart Energy Grid Engineering (SEGE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SEGE.2015.7324577\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE International Conference on Smart Energy Grid Engineering (SEGE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SEGE.2015.7324577","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
New schedule management approach of energy storage system in insular power system
This paper presents an algorithm for integrating and managing electrochemical energy storage systems (ESSs) on unit commitment (UC) problem. As some elements required for integrating electrochemical ESS, such as the power converter, have non-linear characteristics, its corresponding linear modeling could be difficult to be developed and included on the UC problem, which could lead to unfeasible solutions or unexpected results. In order to incorporate full models of ESS and its interface with the power system, in this paper an algorithm to incorporate electrochemical ESS management on the UC problem is presented. An insular power system of 10-units is analyzed, and conclusions are duly drawn.