{"title":"发电投资规划和风险管理在巴尼背景下","authors":"G. Casaravilla, R. Chaer, Ximena Caporale","doi":"10.1109/urucon53396.2021.9647355","DOIUrl":null,"url":null,"abstract":"This paper analyzes the difficulties that power generation investment planners face working in the BANI context. Electricity generation systems are fragile, non-linear, with random components and at times incomprehensible, which makes up the BANI context. This context generates a climate of anxiety for the planner, both for making decisions and for not making them, but more than anything for not knowing how and who will evaluate their work in the future by observing the chronicle of events that have occurred from the wide set of possible chronicles. A concrete example and the consequences of a risk-averse planner not adopting best practices are analyzed in order to mitigate possible future criticism of his work.","PeriodicalId":337257,"journal":{"name":"2021 IEEE URUCON","volume":"115 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-11-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Generation Investment Planning and Risk Management in BANI context\",\"authors\":\"G. Casaravilla, R. Chaer, Ximena Caporale\",\"doi\":\"10.1109/urucon53396.2021.9647355\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper analyzes the difficulties that power generation investment planners face working in the BANI context. Electricity generation systems are fragile, non-linear, with random components and at times incomprehensible, which makes up the BANI context. This context generates a climate of anxiety for the planner, both for making decisions and for not making them, but more than anything for not knowing how and who will evaluate their work in the future by observing the chronicle of events that have occurred from the wide set of possible chronicles. A concrete example and the consequences of a risk-averse planner not adopting best practices are analyzed in order to mitigate possible future criticism of his work.\",\"PeriodicalId\":337257,\"journal\":{\"name\":\"2021 IEEE URUCON\",\"volume\":\"115 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-11-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 IEEE URUCON\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/urucon53396.2021.9647355\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 IEEE URUCON","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/urucon53396.2021.9647355","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

本文分析了发电投资规划人员在BANI环境下工作所面临的困难。发电系统是脆弱的,非线性的,具有随机的组件,有时是不可理解的,这构成了BANI的背景。这种背景为计划者创造了一种焦虑的氛围,无论是做决定还是不做决定,但最重要的是不知道如何以及谁将通过观察从大量可能的编年史中发生的事件编年史来评估他们的工作。本文分析了一个具体的例子,以及规避风险的计划者不采用最佳实践的后果,以减轻未来可能对其工作的批评。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Generation Investment Planning and Risk Management in BANI context
This paper analyzes the difficulties that power generation investment planners face working in the BANI context. Electricity generation systems are fragile, non-linear, with random components and at times incomprehensible, which makes up the BANI context. This context generates a climate of anxiety for the planner, both for making decisions and for not making them, but more than anything for not knowing how and who will evaluate their work in the future by observing the chronicle of events that have occurred from the wide set of possible chronicles. A concrete example and the consequences of a risk-averse planner not adopting best practices are analyzed in order to mitigate possible future criticism of his work.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信