{"title":"需求不确定和价格依赖随机收益的闭环供应链的供应计划","authors":"Jianmai Shi, Guoqing Zhang, K. Lai","doi":"10.1109/BIFE.2009.145","DOIUrl":null,"url":null,"abstract":"This paper considers a single product closed loop supply chain, in which the manufacturer faces an uncertain market demand and price-dependent stochastic returns. There are two options for supplying the products: either producing products by new materials and components, or remanufacturing the recycle products and bringing them back to ‘as new’ conditions. The problem is to determine the quantities of bran-new and remanufactured products, and the acquisition price for used products so that the manufacturer’s total expected profit is maximized. We develop a Nonlinear Programming (NLP) model and present some properties of this problem. With the properties an optimal solution approach is developed. Two numerical examples are used to analyze the problem and test the solution approach.","PeriodicalId":133724,"journal":{"name":"2009 International Conference on Business Intelligence and Financial Engineering","volume":"43 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-07-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Supply Planning for a Closed Loop Supply Chain with Uncertain Demand and Price-Dependent Stochastic Return\",\"authors\":\"Jianmai Shi, Guoqing Zhang, K. Lai\",\"doi\":\"10.1109/BIFE.2009.145\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper considers a single product closed loop supply chain, in which the manufacturer faces an uncertain market demand and price-dependent stochastic returns. There are two options for supplying the products: either producing products by new materials and components, or remanufacturing the recycle products and bringing them back to ‘as new’ conditions. The problem is to determine the quantities of bran-new and remanufactured products, and the acquisition price for used products so that the manufacturer’s total expected profit is maximized. We develop a Nonlinear Programming (NLP) model and present some properties of this problem. With the properties an optimal solution approach is developed. Two numerical examples are used to analyze the problem and test the solution approach.\",\"PeriodicalId\":133724,\"journal\":{\"name\":\"2009 International Conference on Business Intelligence and Financial Engineering\",\"volume\":\"43 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-07-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 International Conference on Business Intelligence and Financial Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/BIFE.2009.145\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 International Conference on Business Intelligence and Financial Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/BIFE.2009.145","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

本文考虑一个单产品闭环供应链,其中制造商面临不确定的市场需求和价格依赖的随机收益。供应产品有两种选择:要么用新材料和新部件生产产品,要么将回收产品重新制造并使其恢复到“新”状态。问题是确定全新产品和再制造产品的数量,以及旧产品的收购价格,使制造商的总期望利润最大化。我们建立了一个非线性规划模型,并给出了该问题的一些性质。根据这些性质,提出了一种最优解方法。用两个数值算例对问题进行了分析和验证。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Supply Planning for a Closed Loop Supply Chain with Uncertain Demand and Price-Dependent Stochastic Return
This paper considers a single product closed loop supply chain, in which the manufacturer faces an uncertain market demand and price-dependent stochastic returns. There are two options for supplying the products: either producing products by new materials and components, or remanufacturing the recycle products and bringing them back to ‘as new’ conditions. The problem is to determine the quantities of bran-new and remanufactured products, and the acquisition price for used products so that the manufacturer’s total expected profit is maximized. We develop a Nonlinear Programming (NLP) model and present some properties of this problem. With the properties an optimal solution approach is developed. Two numerical examples are used to analyze the problem and test the solution approach.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信