{"title":"苏伊士运河海运、港口赛德城国际公司大厦(19世纪建筑创新设计)","authors":"M. Suleiman, Muhammad AL-RASHIDI, Hani Gad Al-Rab","doi":"10.21608/ijaeur.2018.179727","DOIUrl":null,"url":null,"abstract":"This Research includes an Architectural Study for the Building of International Company of the Suez Canal marine, in Port Said City. Port Said City birth certificate was drawn up on April 20, 18AD, corresponding to the Monday of the Spring Festival in the West, when Ferdinand de Lesses struck the first pickaxe announcing the start of work on the site, corresponding to the year 19 AH. The residents of the city were limited to the workers of the excavation site, and their number was about 120, and they were the vanguard of the hungry from all parts of the countries that lie on the Mediterranean from Europe, the Near East and Egypt, and they used to inhabit a group of tents that gathered around a wooden building to be called that camp Port Said was named in honor of Governor Said Pasha, who granted de Lessis the concession to dig the canal..","PeriodicalId":133899,"journal":{"name":"International Journal of Architectural Engineering and Urban Research","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"BUILDING OF INTERNATIONAL COMPANY OF THE SUEZ CANAL MARINE, PORT SAID CITY (ARCHITECTURAL INNOVATION DESIGN OF 19TH CENTURY)\",\"authors\":\"M. Suleiman, Muhammad AL-RASHIDI, Hani Gad Al-Rab\",\"doi\":\"10.21608/ijaeur.2018.179727\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This Research includes an Architectural Study for the Building of International Company of the Suez Canal marine, in Port Said City. Port Said City birth certificate was drawn up on April 20, 18AD, corresponding to the Monday of the Spring Festival in the West, when Ferdinand de Lesses struck the first pickaxe announcing the start of work on the site, corresponding to the year 19 AH. The residents of the city were limited to the workers of the excavation site, and their number was about 120, and they were the vanguard of the hungry from all parts of the countries that lie on the Mediterranean from Europe, the Near East and Egypt, and they used to inhabit a group of tents that gathered around a wooden building to be called that camp Port Said was named in honor of Governor Said Pasha, who granted de Lessis the concession to dig the canal..\",\"PeriodicalId\":133899,\"journal\":{\"name\":\"International Journal of Architectural Engineering and Urban Research\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Architectural Engineering and Urban Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21608/ijaeur.2018.179727\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Architectural Engineering and Urban Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21608/ijaeur.2018.179727","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5
摘要
本研究包括对塞得港市苏伊士运河海运国际公司大楼的建筑研究。塞得港城的出生证明是在公元18年4月20日起草的,与西方春节的星期一相对应,当时费迪南德·德·莱斯(Ferdinand de less)第一次敲击鹤嘴锄,宣布在该地点开始工作,相当于公元19年。城市的居民仅限于挖掘现场的工人,和他们的数量约为120,和他们的先锋饿躺在地中海国家的所有部分来自欧洲、近东和埃及,他们用来居住的帐篷,聚集在一个木制的建筑被称为营塞得港是为纪念州长帕夏说,谁授予de Lessis让步挖运河. .
BUILDING OF INTERNATIONAL COMPANY OF THE SUEZ CANAL MARINE, PORT SAID CITY (ARCHITECTURAL INNOVATION DESIGN OF 19TH CENTURY)
This Research includes an Architectural Study for the Building of International Company of the Suez Canal marine, in Port Said City. Port Said City birth certificate was drawn up on April 20, 18AD, corresponding to the Monday of the Spring Festival in the West, when Ferdinand de Lesses struck the first pickaxe announcing the start of work on the site, corresponding to the year 19 AH. The residents of the city were limited to the workers of the excavation site, and their number was about 120, and they were the vanguard of the hungry from all parts of the countries that lie on the Mediterranean from Europe, the Near East and Egypt, and they used to inhabit a group of tents that gathered around a wooden building to be called that camp Port Said was named in honor of Governor Said Pasha, who granted de Lessis the concession to dig the canal..