{"title":"利用专家系统进行建筑物风险分析:以孟加拉国为例","authors":"M. Patwary, S. Hossain","doi":"10.1109/ICAEE.2015.7506816","DOIUrl":null,"url":null,"abstract":"This paper represents an expert system which determines to what extant a building is risky. In this purpose, all the available systems to analyze the risk of a building are first examined. The existing systems are unable to handle uncertainty, which is actually a big challenge for analyzing the risk of a building. However, the rule based expert system, proposed in this paper is capable of capturing all the uncertainties during the risk analysis of a building. The proposed system is developed by using Rule based Inference Methodology Using Evidential Reasoning (RIMER) Approach. Signs of a risky building are considered by RIMER Approach to infer the risk level of a building. Experimented results show that the proposed system analyzes level of the risk more efficiently than the existing systems.","PeriodicalId":123939,"journal":{"name":"2015 International Conference on Advances in Electrical Engineering (ICAEE)","volume":"55 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Risk analysis of buildings using an expert system: A case study in Bangladesh\",\"authors\":\"M. Patwary, S. Hossain\",\"doi\":\"10.1109/ICAEE.2015.7506816\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper represents an expert system which determines to what extant a building is risky. In this purpose, all the available systems to analyze the risk of a building are first examined. The existing systems are unable to handle uncertainty, which is actually a big challenge for analyzing the risk of a building. However, the rule based expert system, proposed in this paper is capable of capturing all the uncertainties during the risk analysis of a building. The proposed system is developed by using Rule based Inference Methodology Using Evidential Reasoning (RIMER) Approach. Signs of a risky building are considered by RIMER Approach to infer the risk level of a building. Experimented results show that the proposed system analyzes level of the risk more efficiently than the existing systems.\",\"PeriodicalId\":123939,\"journal\":{\"name\":\"2015 International Conference on Advances in Electrical Engineering (ICAEE)\",\"volume\":\"55 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 International Conference on Advances in Electrical Engineering (ICAEE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICAEE.2015.7506816\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Conference on Advances in Electrical Engineering (ICAEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICAEE.2015.7506816","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Risk analysis of buildings using an expert system: A case study in Bangladesh
This paper represents an expert system which determines to what extant a building is risky. In this purpose, all the available systems to analyze the risk of a building are first examined. The existing systems are unable to handle uncertainty, which is actually a big challenge for analyzing the risk of a building. However, the rule based expert system, proposed in this paper is capable of capturing all the uncertainties during the risk analysis of a building. The proposed system is developed by using Rule based Inference Methodology Using Evidential Reasoning (RIMER) Approach. Signs of a risky building are considered by RIMER Approach to infer the risk level of a building. Experimented results show that the proposed system analyzes level of the risk more efficiently than the existing systems.