{"title":"用于电力系统保护和控制的相量测量单元(pmu)的同步、校准、测试和安装IEEE指南","authors":"","doi":"10.1109/IEEESTD.2021.9574625","DOIUrl":null,"url":null,"abstract":"Guidance for synchronization, calibration, testing, and installation of phasor measurement units (PMUs) applied in power systems is provided. The following are addressed in this guide: (a) considerations for the installation of PMU devices based on application requirements and typical substation electrical bus configurations; (b) techniques focusing on the overall accuracy and availability of the time synchronization system; (c) test and calibration procedures for PMUs for laboratory and field applications; and (d) communications testing for connecting PMUs to other devices including phasor data concentrators.","PeriodicalId":342225,"journal":{"name":"IEEE Std C37.242-2021 (Revision of IEEE Std C37.242-2013)","volume":"318 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-10-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"16","resultStr":"{\"title\":\"IEEE Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement Units (PMUs) for Power System Protection and Control\",\"authors\":\"\",\"doi\":\"10.1109/IEEESTD.2021.9574625\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Guidance for synchronization, calibration, testing, and installation of phasor measurement units (PMUs) applied in power systems is provided. The following are addressed in this guide: (a) considerations for the installation of PMU devices based on application requirements and typical substation electrical bus configurations; (b) techniques focusing on the overall accuracy and availability of the time synchronization system; (c) test and calibration procedures for PMUs for laboratory and field applications; and (d) communications testing for connecting PMUs to other devices including phasor data concentrators.\",\"PeriodicalId\":342225,\"journal\":{\"name\":\"IEEE Std C37.242-2021 (Revision of IEEE Std C37.242-2013)\",\"volume\":\"318 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-10-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"16\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE Std C37.242-2021 (Revision of IEEE Std C37.242-2013)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEESTD.2021.9574625\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Std C37.242-2021 (Revision of IEEE Std C37.242-2013)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEESTD.2021.9574625","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
IEEE Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement Units (PMUs) for Power System Protection and Control
Guidance for synchronization, calibration, testing, and installation of phasor measurement units (PMUs) applied in power systems is provided. The following are addressed in this guide: (a) considerations for the installation of PMU devices based on application requirements and typical substation electrical bus configurations; (b) techniques focusing on the overall accuracy and availability of the time synchronization system; (c) test and calibration procedures for PMUs for laboratory and field applications; and (d) communications testing for connecting PMUs to other devices including phasor data concentrators.