基于改进人工鱼群算法的有源配电网双级优化调度方法

Ding Li, Yi Luo, Shengcun Zhou, Xuancheng Yi, Yiwang Xiong, Yaning Wu
{"title":"基于改进人工鱼群算法的有源配电网双级优化调度方法","authors":"Ding Li, Yi Luo, Shengcun Zhou, Xuancheng Yi, Yiwang Xiong, Yaning Wu","doi":"10.1109/CEEPE58418.2023.10166727","DOIUrl":null,"url":null,"abstract":"When flexible resources such as smart switches are connected to the low-voltage distribution network, the distribution network has better observability and controllability. Meanwhile, the distribution network with a high proportion of new energy faces the challenge of high dispatch costs and difficulty of renewable energy accommodation. In order to improve the economy and reliability of distribution network operation. This paper proposes a bi-level optimal scheduling model for active distribution networks considering dynamic reconfiguration. The upper layer of the model is the distribution network reconfiguration model. The optimization objectives are the minimum total operating cost and the optimal power supply quality, which is a multi-objective optimization, the decision variable is the grid structure for each reconstruction cycle. The lower layer of the model is the economic scheduling model, the optimization goal is to minimize the total operating cost, and the decision variable is the output of each flexible resource. And the improved artificial fish swarm algorithm is used to solve the proposed model. Finally, an IEEE33 node power distribution system is used for the case study. From the simulation results, the bi-level optimization model can significantly improve the operation economy and reliability of the distribution network.","PeriodicalId":431552,"journal":{"name":"2023 6th International Conference on Energy, Electrical and Power Engineering (CEEPE)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-05-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Bi-Level Optimal Dispatch Method of Active Distribution Network Based on Improved Artificial Fish Swarm Algorithm\",\"authors\":\"Ding Li, Yi Luo, Shengcun Zhou, Xuancheng Yi, Yiwang Xiong, Yaning Wu\",\"doi\":\"10.1109/CEEPE58418.2023.10166727\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"When flexible resources such as smart switches are connected to the low-voltage distribution network, the distribution network has better observability and controllability. Meanwhile, the distribution network with a high proportion of new energy faces the challenge of high dispatch costs and difficulty of renewable energy accommodation. In order to improve the economy and reliability of distribution network operation. This paper proposes a bi-level optimal scheduling model for active distribution networks considering dynamic reconfiguration. The upper layer of the model is the distribution network reconfiguration model. The optimization objectives are the minimum total operating cost and the optimal power supply quality, which is a multi-objective optimization, the decision variable is the grid structure for each reconstruction cycle. The lower layer of the model is the economic scheduling model, the optimization goal is to minimize the total operating cost, and the decision variable is the output of each flexible resource. And the improved artificial fish swarm algorithm is used to solve the proposed model. Finally, an IEEE33 node power distribution system is used for the case study. From the simulation results, the bi-level optimization model can significantly improve the operation economy and reliability of the distribution network.\",\"PeriodicalId\":431552,\"journal\":{\"name\":\"2023 6th International Conference on Energy, Electrical and Power Engineering (CEEPE)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-05-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2023 6th International Conference on Energy, Electrical and Power Engineering (CEEPE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CEEPE58418.2023.10166727\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2023 6th International Conference on Energy, Electrical and Power Engineering (CEEPE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CEEPE58418.2023.10166727","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

当智能开关等柔性资源接入低压配电网时,配电网具有更好的可观察性和可控性。同时,新能源占比高的配电网面临着调度成本高、可再生能源调节困难的挑战。以提高配电网运行的经济性和可靠性。提出了考虑动态重构的有源配电网双层最优调度模型。该模型的上层是配电网重构模型。优化目标为总运行成本最小和供电质量最优,是一个多目标优化问题,决策变量为各改造周期的电网结构。模型的下层为经济调度模型,优化目标为总运行成本最小,决策变量为各柔性资源的产出。采用改进的人工鱼群算法对模型进行求解。最后,以IEEE33节点配电系统为例进行了研究。仿真结果表明,双层优化模型能显著提高配电网的运行经济性和可靠性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Bi-Level Optimal Dispatch Method of Active Distribution Network Based on Improved Artificial Fish Swarm Algorithm
When flexible resources such as smart switches are connected to the low-voltage distribution network, the distribution network has better observability and controllability. Meanwhile, the distribution network with a high proportion of new energy faces the challenge of high dispatch costs and difficulty of renewable energy accommodation. In order to improve the economy and reliability of distribution network operation. This paper proposes a bi-level optimal scheduling model for active distribution networks considering dynamic reconfiguration. The upper layer of the model is the distribution network reconfiguration model. The optimization objectives are the minimum total operating cost and the optimal power supply quality, which is a multi-objective optimization, the decision variable is the grid structure for each reconstruction cycle. The lower layer of the model is the economic scheduling model, the optimization goal is to minimize the total operating cost, and the decision variable is the output of each flexible resource. And the improved artificial fish swarm algorithm is used to solve the proposed model. Finally, an IEEE33 node power distribution system is used for the case study. From the simulation results, the bi-level optimization model can significantly improve the operation economy and reliability of the distribution network.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信