采用现代启发式技术求解具有阀点负荷的经济调度问题

R. Rajathy, S. Ilayaraja, C. Savitha, Harish Kumar
{"title":"采用现代启发式技术求解具有阀点负荷的经济调度问题","authors":"R. Rajathy, S. Ilayaraja, C. Savitha, Harish Kumar","doi":"10.1109/POWERI.2006.1632583","DOIUrl":null,"url":null,"abstract":"This paper presents an efficient and reliable evolutionary programming based algorithm for solving economic load dispatch problem with valve point loading. The superiority of EP and HEP methods has been demonstrated for 3 unit system by performing valve point curves including losses. It has been observed that the HEP outperforms the other methods in solving power system economic load dispatch problem in terms of convergence rate, and quality and success rate","PeriodicalId":191301,"journal":{"name":"2006 IEEE Power India Conference","volume":"93 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-06-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Implementation of modern heuristic techniques for solution of economic dispatch problem with valve point loading\",\"authors\":\"R. Rajathy, S. Ilayaraja, C. Savitha, Harish Kumar\",\"doi\":\"10.1109/POWERI.2006.1632583\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents an efficient and reliable evolutionary programming based algorithm for solving economic load dispatch problem with valve point loading. The superiority of EP and HEP methods has been demonstrated for 3 unit system by performing valve point curves including losses. It has been observed that the HEP outperforms the other methods in solving power system economic load dispatch problem in terms of convergence rate, and quality and success rate\",\"PeriodicalId\":191301,\"journal\":{\"name\":\"2006 IEEE Power India Conference\",\"volume\":\"93 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-06-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2006 IEEE Power India Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/POWERI.2006.1632583\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 IEEE Power India Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/POWERI.2006.1632583","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

本文提出了一种高效可靠的基于进化规划的求解阀点负荷经济调度问题的算法。通过计算含损失的阀点曲线,证明了EP和HEP方法在3单元系统中的优越性。研究表明,HEP在求解电力系统经济负荷调度问题的收敛速度、质量和成功率方面都优于其他方法
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Implementation of modern heuristic techniques for solution of economic dispatch problem with valve point loading
This paper presents an efficient and reliable evolutionary programming based algorithm for solving economic load dispatch problem with valve point loading. The superiority of EP and HEP methods has been demonstrated for 3 unit system by performing valve point curves including losses. It has been observed that the HEP outperforms the other methods in solving power system economic load dispatch problem in terms of convergence rate, and quality and success rate
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信