{"title":"项目管理软件在加纳交钥匙电气化项目中的应用","authors":"Zachariah Pabi Gariba","doi":"10.1109/CYBER.2014.6917539","DOIUrl":null,"url":null,"abstract":"This study establishes the use of software to provide efficiency for turnkey electrification projects in Ghana. A correlation design method is employed to a sample of thirty one stakeholders in the power distribution sector in Ghana, and it reveals that there is negative perceived ease of use of software for managements of electrical turnkey projects. T-Test conducted on usage of PM software indicated that statistically there is no usage of PM software and those projects are manually managed in Ghana.","PeriodicalId":183401,"journal":{"name":"The 4th Annual IEEE International Conference on Cyber Technology in Automation, Control and Intelligent","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-06-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Application of project management software in turnkey electrification projects in Ghana\",\"authors\":\"Zachariah Pabi Gariba\",\"doi\":\"10.1109/CYBER.2014.6917539\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study establishes the use of software to provide efficiency for turnkey electrification projects in Ghana. A correlation design method is employed to a sample of thirty one stakeholders in the power distribution sector in Ghana, and it reveals that there is negative perceived ease of use of software for managements of electrical turnkey projects. T-Test conducted on usage of PM software indicated that statistically there is no usage of PM software and those projects are manually managed in Ghana.\",\"PeriodicalId\":183401,\"journal\":{\"name\":\"The 4th Annual IEEE International Conference on Cyber Technology in Automation, Control and Intelligent\",\"volume\":\"34 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-06-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The 4th Annual IEEE International Conference on Cyber Technology in Automation, Control and Intelligent\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CYBER.2014.6917539\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The 4th Annual IEEE International Conference on Cyber Technology in Automation, Control and Intelligent","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CYBER.2014.6917539","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Application of project management software in turnkey electrification projects in Ghana
This study establishes the use of software to provide efficiency for turnkey electrification projects in Ghana. A correlation design method is employed to a sample of thirty one stakeholders in the power distribution sector in Ghana, and it reveals that there is negative perceived ease of use of software for managements of electrical turnkey projects. T-Test conducted on usage of PM software indicated that statistically there is no usage of PM software and those projects are manually managed in Ghana.