稀缺价格环境下伦敦证券交易所的金融机会

Zhaohao Ding, Piampoom Sarikprueck, L. Lee, Weijen Lee, Jie Shi, Heng Lu
{"title":"稀缺价格环境下伦敦证券交易所的金融机会","authors":"Zhaohao Ding, Piampoom Sarikprueck, L. Lee, Weijen Lee, Jie Shi, Heng Lu","doi":"10.1109/NAPS.2014.6965408","DOIUrl":null,"url":null,"abstract":"To compensate for “missing money”, the Electric Reliability Council of Texas (ERCOT) has continued to increase the offer price cap since the nodal market opened in 2010. This provides financial opportunities for Load Serving Entities (LSE) to deploy demand response. This paper proposes a quasi-real time incentive based demand response (IBDR) scheme for LSE to take advantage of scarcity prices. Combined with the scheme is a hybrid spike price forecasting model also presented by this paper. Numerical case studies are conducted based on the realistic ERCOT load zone price data. The results illustrate the financial benefits achieved by this proposed IBDR scheme.","PeriodicalId":421766,"journal":{"name":"2014 North American Power Symposium (NAPS)","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-11-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Financial opportunities for LSE under scarcity price environment\",\"authors\":\"Zhaohao Ding, Piampoom Sarikprueck, L. Lee, Weijen Lee, Jie Shi, Heng Lu\",\"doi\":\"10.1109/NAPS.2014.6965408\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"To compensate for “missing money”, the Electric Reliability Council of Texas (ERCOT) has continued to increase the offer price cap since the nodal market opened in 2010. This provides financial opportunities for Load Serving Entities (LSE) to deploy demand response. This paper proposes a quasi-real time incentive based demand response (IBDR) scheme for LSE to take advantage of scarcity prices. Combined with the scheme is a hybrid spike price forecasting model also presented by this paper. Numerical case studies are conducted based on the realistic ERCOT load zone price data. The results illustrate the financial benefits achieved by this proposed IBDR scheme.\",\"PeriodicalId\":421766,\"journal\":{\"name\":\"2014 North American Power Symposium (NAPS)\",\"volume\":\"32 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-11-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 North American Power Symposium (NAPS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/NAPS.2014.6965408\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 North American Power Symposium (NAPS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/NAPS.2014.6965408","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

为了弥补“损失的钱”,自2010年节点市场开放以来,德克萨斯州电力可靠性委员会(ERCOT)一直在不断提高报价上限。这为负载服务实体(LSE)部署需求响应提供了财务机会。本文提出了一种准实时的基于激励的需求响应(IBDR)方案,使伦敦证交所能够充分利用稀缺性价格。与此方案相结合,本文还提出了一个混合尖峰价格预测模型。基于实际的ERCOT负荷区价格数据进行了数值算例研究。结果表明,提出的IBDR方案取得了经济效益。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Financial opportunities for LSE under scarcity price environment
To compensate for “missing money”, the Electric Reliability Council of Texas (ERCOT) has continued to increase the offer price cap since the nodal market opened in 2010. This provides financial opportunities for Load Serving Entities (LSE) to deploy demand response. This paper proposes a quasi-real time incentive based demand response (IBDR) scheme for LSE to take advantage of scarcity prices. Combined with the scheme is a hybrid spike price forecasting model also presented by this paper. Numerical case studies are conducted based on the realistic ERCOT load zone price data. The results illustrate the financial benefits achieved by this proposed IBDR scheme.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信