{"title":"孤岛运行微电网未使用容量的评估","authors":"Abdullah Albaker, A. Khodaei","doi":"10.1109/NAPS.2017.8107325","DOIUrl":null,"url":null,"abstract":"Microgrids, as small-scale power systems, comprise various types of distributed energy resources (DERs) installed next to loads. Islanding, as a salient feature of microgrids, requires adequate installed dispatchable capacity to fully supply local critical loads when disconnected from the utility grid. There is however a great potential that this installed capacity is underutilized, resulting in negative economic impacts. This paper investigates the microgrid unused capacity in the islanded operation, and further determines the value of this unused capacity, thus creating stepwise generation price bids. A microgrid optimal scheduling model is developed for the purpose of assessment in this paper, which is further used to study a test microgrid for a period of one year.","PeriodicalId":296428,"journal":{"name":"2017 North American Power Symposium (NAPS)","volume":"20 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Valuation of microgrid unused capacity in islanded operation\",\"authors\":\"Abdullah Albaker, A. Khodaei\",\"doi\":\"10.1109/NAPS.2017.8107325\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Microgrids, as small-scale power systems, comprise various types of distributed energy resources (DERs) installed next to loads. Islanding, as a salient feature of microgrids, requires adequate installed dispatchable capacity to fully supply local critical loads when disconnected from the utility grid. There is however a great potential that this installed capacity is underutilized, resulting in negative economic impacts. This paper investigates the microgrid unused capacity in the islanded operation, and further determines the value of this unused capacity, thus creating stepwise generation price bids. A microgrid optimal scheduling model is developed for the purpose of assessment in this paper, which is further used to study a test microgrid for a period of one year.\",\"PeriodicalId\":296428,\"journal\":{\"name\":\"2017 North American Power Symposium (NAPS)\",\"volume\":\"20 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 North American Power Symposium (NAPS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/NAPS.2017.8107325\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 North American Power Symposium (NAPS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/NAPS.2017.8107325","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Valuation of microgrid unused capacity in islanded operation
Microgrids, as small-scale power systems, comprise various types of distributed energy resources (DERs) installed next to loads. Islanding, as a salient feature of microgrids, requires adequate installed dispatchable capacity to fully supply local critical loads when disconnected from the utility grid. There is however a great potential that this installed capacity is underutilized, resulting in negative economic impacts. This paper investigates the microgrid unused capacity in the islanded operation, and further determines the value of this unused capacity, thus creating stepwise generation price bids. A microgrid optimal scheduling model is developed for the purpose of assessment in this paper, which is further used to study a test microgrid for a period of one year.