{"title":"美国新建水泥厂的仪表、控制和电气系统策略","authors":"J. Kemmerer","doi":"10.1109/CITCON.1988.13249","DOIUrl":null,"url":null,"abstract":"Many factors must be considered to accomplish a low-cost strategy; site selection, process selection, and equipment selection are a few of the major factors. After these selections are made, the design of the instrumentation and control systems provide a major area of opportunity. The author provides an overview of these systems. The plant of interest is a 1-million-ton-/yr dry process plant consisting of a four-stage precalciner preheater feeding a 14'6\" kiln, and an eight-compartment ventless grate cooler. Issues discussed are process control, process design and control systems, and operator interface. It is concluded that the resulting plant is a low-cost facility with impressive credentials, e.g. heat consumption at 8% below guarantee and power consumption at 95 kW/ST.<<ETX>>","PeriodicalId":118848,"journal":{"name":"30th IEEE Cement Industry Technical Conference","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Instrumentation, control and electrical systems strategy for a new US cement plant\",\"authors\":\"J. Kemmerer\",\"doi\":\"10.1109/CITCON.1988.13249\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Many factors must be considered to accomplish a low-cost strategy; site selection, process selection, and equipment selection are a few of the major factors. After these selections are made, the design of the instrumentation and control systems provide a major area of opportunity. The author provides an overview of these systems. The plant of interest is a 1-million-ton-/yr dry process plant consisting of a four-stage precalciner preheater feeding a 14'6\\\" kiln, and an eight-compartment ventless grate cooler. Issues discussed are process control, process design and control systems, and operator interface. It is concluded that the resulting plant is a low-cost facility with impressive credentials, e.g. heat consumption at 8% below guarantee and power consumption at 95 kW/ST.<<ETX>>\",\"PeriodicalId\":118848,\"journal\":{\"name\":\"30th IEEE Cement Industry Technical Conference\",\"volume\":\"27 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"30th IEEE Cement Industry Technical Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CITCON.1988.13249\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"30th IEEE Cement Industry Technical Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CITCON.1988.13249","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Instrumentation, control and electrical systems strategy for a new US cement plant
Many factors must be considered to accomplish a low-cost strategy; site selection, process selection, and equipment selection are a few of the major factors. After these selections are made, the design of the instrumentation and control systems provide a major area of opportunity. The author provides an overview of these systems. The plant of interest is a 1-million-ton-/yr dry process plant consisting of a four-stage precalciner preheater feeding a 14'6" kiln, and an eight-compartment ventless grate cooler. Issues discussed are process control, process design and control systems, and operator interface. It is concluded that the resulting plant is a low-cost facility with impressive credentials, e.g. heat consumption at 8% below guarantee and power consumption at 95 kW/ST.<>