具有固定日期约束的工作流延迟时间的计算

Martin Bierbaumer, Johann Eder, H. Pichler
{"title":"具有固定日期约束的工作流延迟时间的计算","authors":"Martin Bierbaumer, Johann Eder, H. Pichler","doi":"10.1109/ICECT.2005.26","DOIUrl":null,"url":null,"abstract":"Workflow participants are faced with the problem to select one out many work items in their worklist. The decision to execute one specific work item implicitly postpones the execution of all other items. This may lead to disproportionately increased execution durations of the associated workflows, especially if fixed-date constraints are defined on succeeding tasks. In this paper, we show how to utilize a workflows control structure augmented with information about timing behavior to calculate what delay to expect when the execution of a work item is postponed to certain dates. This information can be used to assist the participant in order to increase the workflow throughput and avoid time-related escalations.","PeriodicalId":312957,"journal":{"name":"Seventh IEEE International Conference on E-Commerce Technology (CEC'05)","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-07-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Calculation of delay times for workflows with fixed-date constraints\",\"authors\":\"Martin Bierbaumer, Johann Eder, H. Pichler\",\"doi\":\"10.1109/ICECT.2005.26\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Workflow participants are faced with the problem to select one out many work items in their worklist. The decision to execute one specific work item implicitly postpones the execution of all other items. This may lead to disproportionately increased execution durations of the associated workflows, especially if fixed-date constraints are defined on succeeding tasks. In this paper, we show how to utilize a workflows control structure augmented with information about timing behavior to calculate what delay to expect when the execution of a work item is postponed to certain dates. This information can be used to assist the participant in order to increase the workflow throughput and avoid time-related escalations.\",\"PeriodicalId\":312957,\"journal\":{\"name\":\"Seventh IEEE International Conference on E-Commerce Technology (CEC'05)\",\"volume\":\"18 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2005-07-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Seventh IEEE International Conference on E-Commerce Technology (CEC'05)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICECT.2005.26\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Seventh IEEE International Conference on E-Commerce Technology (CEC'05)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICECT.2005.26","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

工作流参与者面临着在工作列表中选择一个工作项的问题。执行一个特定工作项的决定隐式地推迟了所有其他工作项的执行。这可能导致相关工作流的执行持续时间不成比例地增加,特别是在后续任务上定义了固定日期约束的情况下。在本文中,我们展示了如何利用一个带有时间行为信息的工作流控制结构来计算当工作项的执行被推迟到特定日期时预期的延迟。此信息可用于帮助参与者提高工作流吞吐量并避免与时间相关的升级。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Calculation of delay times for workflows with fixed-date constraints
Workflow participants are faced with the problem to select one out many work items in their worklist. The decision to execute one specific work item implicitly postpones the execution of all other items. This may lead to disproportionately increased execution durations of the associated workflows, especially if fixed-date constraints are defined on succeeding tasks. In this paper, we show how to utilize a workflows control structure augmented with information about timing behavior to calculate what delay to expect when the execution of a work item is postponed to certain dates. This information can be used to assist the participant in order to increase the workflow throughput and avoid time-related escalations.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信