{"title":"复杂设备SBA全寿命周期成本模型研究","authors":"Guo Jing, Lin Qi, L. Desheng, Guo Qin","doi":"10.1109/ISRA.2012.6219151","DOIUrl":null,"url":null,"abstract":"Aimed at the deficiency of traditional acquisition method for complex equipment development, acquisition pattern of SBA(Simulation Based Acquisition) is advanced combining the M&S technology and acquisition process. The paper analyzes the LCC(Life Cycle Cost) of SBA, then provides the trait of cost and constitution of cost. The model of LCC considing time element is built.","PeriodicalId":266930,"journal":{"name":"2012 IEEE Symposium on Robotics and Applications (ISRA)","volume":"1 3","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-06-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research on Life Cycle Cost model of SBA for complex equipment\",\"authors\":\"Guo Jing, Lin Qi, L. Desheng, Guo Qin\",\"doi\":\"10.1109/ISRA.2012.6219151\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Aimed at the deficiency of traditional acquisition method for complex equipment development, acquisition pattern of SBA(Simulation Based Acquisition) is advanced combining the M&S technology and acquisition process. The paper analyzes the LCC(Life Cycle Cost) of SBA, then provides the trait of cost and constitution of cost. The model of LCC considing time element is built.\",\"PeriodicalId\":266930,\"journal\":{\"name\":\"2012 IEEE Symposium on Robotics and Applications (ISRA)\",\"volume\":\"1 3\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-06-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 IEEE Symposium on Robotics and Applications (ISRA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISRA.2012.6219151\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 IEEE Symposium on Robotics and Applications (ISRA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISRA.2012.6219151","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Research on Life Cycle Cost model of SBA for complex equipment
Aimed at the deficiency of traditional acquisition method for complex equipment development, acquisition pattern of SBA(Simulation Based Acquisition) is advanced combining the M&S technology and acquisition process. The paper analyzes the LCC(Life Cycle Cost) of SBA, then provides the trait of cost and constitution of cost. The model of LCC considing time element is built.