{"title":"用青蛙跳跃算法寻找汽车制造单元的最优物质汽车容量","authors":"Denise Barzaga, Elías Carrum","doi":"10.4018/978-1-5225-8131-4.CH020","DOIUrl":null,"url":null,"abstract":"Due to the worldwide strengthening of the automotive sector, it presents itself as a challenge for the companies that comprise it to immerse themselves in processes of continuous improvement that contribute to increasing the satisfaction of the needs of its customers, as well as achieving a better positioning in the market. This goal is impossible to reach without proper design and management of the supply chain, consideration of issues related to logistics and inclusion of innovative techniques. In the chapter, the authors considered a manufacturing cell responsible for making the assembly of seats for the automotive industry. Waiting times and blocking of machines are incurred by not using the optimum number of vehicles to be used for the transfer of materials and the capacity with which they should count. The objective of this research is to know near-optimum quantities and capacities of the vehicles, materialistic cars, to avoid this situation. The use of mathematical formulations, simulation, and optimization techniques will be used to solve the problem.","PeriodicalId":190605,"journal":{"name":"Advances in Human Resources Management and Organizational Development","volume":"15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Searching for the Optimum Number of Capacitated Materialistic Cars for an Automotive Manufacturing Cell Using a Shuffled Frog Leap Algorithm\",\"authors\":\"Denise Barzaga, Elías Carrum\",\"doi\":\"10.4018/978-1-5225-8131-4.CH020\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Due to the worldwide strengthening of the automotive sector, it presents itself as a challenge for the companies that comprise it to immerse themselves in processes of continuous improvement that contribute to increasing the satisfaction of the needs of its customers, as well as achieving a better positioning in the market. This goal is impossible to reach without proper design and management of the supply chain, consideration of issues related to logistics and inclusion of innovative techniques. In the chapter, the authors considered a manufacturing cell responsible for making the assembly of seats for the automotive industry. Waiting times and blocking of machines are incurred by not using the optimum number of vehicles to be used for the transfer of materials and the capacity with which they should count. The objective of this research is to know near-optimum quantities and capacities of the vehicles, materialistic cars, to avoid this situation. The use of mathematical formulations, simulation, and optimization techniques will be used to solve the problem.\",\"PeriodicalId\":190605,\"journal\":{\"name\":\"Advances in Human Resources Management and Organizational Development\",\"volume\":\"15 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Advances in Human Resources Management and Organizational Development\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4018/978-1-5225-8131-4.CH020\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advances in Human Resources Management and Organizational Development","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4018/978-1-5225-8131-4.CH020","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Searching for the Optimum Number of Capacitated Materialistic Cars for an Automotive Manufacturing Cell Using a Shuffled Frog Leap Algorithm
Due to the worldwide strengthening of the automotive sector, it presents itself as a challenge for the companies that comprise it to immerse themselves in processes of continuous improvement that contribute to increasing the satisfaction of the needs of its customers, as well as achieving a better positioning in the market. This goal is impossible to reach without proper design and management of the supply chain, consideration of issues related to logistics and inclusion of innovative techniques. In the chapter, the authors considered a manufacturing cell responsible for making the assembly of seats for the automotive industry. Waiting times and blocking of machines are incurred by not using the optimum number of vehicles to be used for the transfer of materials and the capacity with which they should count. The objective of this research is to know near-optimum quantities and capacities of the vehicles, materialistic cars, to avoid this situation. The use of mathematical formulations, simulation, and optimization techniques will be used to solve the problem.