审裁官的决定

The Rt Hon. Lord Justice Coulson
{"title":"审裁官的决定","authors":"The Rt Hon. Lord Justice Coulson","doi":"10.1093/oso/9780198822110.003.0026","DOIUrl":null,"url":null,"abstract":"Reasons\n It is often forgotten that, under the Scheme for Construction Contracts, the adjudicator is not required to give reasons unless at least one of the parties requires them. Thus it is necessary for one or both of the parties to notify the...","PeriodicalId":434490,"journal":{"name":"Coulson on Construction Adjudication","volume":"309 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Adjudicator’s Decision\",\"authors\":\"The Rt Hon. Lord Justice Coulson\",\"doi\":\"10.1093/oso/9780198822110.003.0026\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Reasons\\n It is often forgotten that, under the Scheme for Construction Contracts, the adjudicator is not required to give reasons unless at least one of the parties requires them. Thus it is necessary for one or both of the parties to notify the...\",\"PeriodicalId\":434490,\"journal\":{\"name\":\"Coulson on Construction Adjudication\",\"volume\":\"309 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Coulson on Construction Adjudication\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1093/oso/9780198822110.003.0026\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Coulson on Construction Adjudication","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1093/oso/9780198822110.003.0026","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

人们常常忘记,根据建筑合约计划,审裁官无须提供理由,除非至少有一方提出要求。因此,一方或双方有必要通知……
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Adjudicator’s Decision
Reasons It is often forgotten that, under the Scheme for Construction Contracts, the adjudicator is not required to give reasons unless at least one of the parties requires them. Thus it is necessary for one or both of the parties to notify the...
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信