Andi Maddeppungeng, S. Asyiah, Rifky Ujianto, Bagus Istigosah Akbar, Dwi Novi Setiawati
{"title":"基于故障树分析(FTA)和失效模式与影响分析(FMEA)方法的工程延期分析(以Karian Rangkasbitung大坝开发项目为例)","authors":"Andi Maddeppungeng, S. Asyiah, Rifky Ujianto, Bagus Istigosah Akbar, Dwi Novi Setiawati","doi":"10.36055/fondasi.v12i1.19545","DOIUrl":null,"url":null,"abstract":"ABSTRACT","PeriodicalId":231649,"journal":{"name":"Fondasi : Jurnal Teknik Sipil","volume":"257 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-05-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Project Delay Analysis Using Fault Tree Analysis (FTA) Method And Failure Mode And Effect Analysis (FMEA) Method (Case Study of the Karian Rangkasbitung Dam Development Project)\",\"authors\":\"Andi Maddeppungeng, S. Asyiah, Rifky Ujianto, Bagus Istigosah Akbar, Dwi Novi Setiawati\",\"doi\":\"10.36055/fondasi.v12i1.19545\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT\",\"PeriodicalId\":231649,\"journal\":{\"name\":\"Fondasi : Jurnal Teknik Sipil\",\"volume\":\"257 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-05-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Fondasi : Jurnal Teknik Sipil\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36055/fondasi.v12i1.19545\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Fondasi : Jurnal Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36055/fondasi.v12i1.19545","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Project Delay Analysis Using Fault Tree Analysis (FTA) Method And Failure Mode And Effect Analysis (FMEA) Method (Case Study of the Karian Rangkasbitung Dam Development Project)