{"title":"基于福岛第一核电站2号机组安全壳泄漏的教训提高主安全壳稳健性和过滤式安全壳排气系统运行的措施","authors":"S. Kawamura, S. Ooki, T. Narabayashi","doi":"10.3327/TAESJ.J15.018","DOIUrl":null,"url":null,"abstract":"Shinichi KAWAMURA, Suguru OOKI and Tadashi NARABAYASHI Nuclear Asset Management Department, Tokyo Electric Power Company, 1-1-3 Uchisaiwai-cho, Chiyoda-ku, Tokyo 100-8560, Japan R&D Department, TEPCO Research Institute, Tokyo Electric Power Company, 4-1 Egasaki-cho, Tsurumi-ku, Yokohama 230-8510, Japan Division of Energy and Environmental Systems, Graduate School of Engineering, Hokkaido University, Kita-13, Nishi-8, Kita-ku, Sapporo 060-8628, Japan (Received September 29, 2015; accepted in revised form November 6, 2015; published online March 15, 2016)","PeriodicalId":121793,"journal":{"name":"Insights Concerning the Fukushima Daiichi Nuclear Accident Vol. 4","volume":"47 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Measures to Improve Robustness of Primary Containment Vessel and Operation of Filtered Containment Venting System Based on the Lessons from the Containment Leak at Fukushima Dai-ichi Nuclear Power Station Unit 2\",\"authors\":\"S. Kawamura, S. Ooki, T. Narabayashi\",\"doi\":\"10.3327/TAESJ.J15.018\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Shinichi KAWAMURA, Suguru OOKI and Tadashi NARABAYASHI Nuclear Asset Management Department, Tokyo Electric Power Company, 1-1-3 Uchisaiwai-cho, Chiyoda-ku, Tokyo 100-8560, Japan R&D Department, TEPCO Research Institute, Tokyo Electric Power Company, 4-1 Egasaki-cho, Tsurumi-ku, Yokohama 230-8510, Japan Division of Energy and Environmental Systems, Graduate School of Engineering, Hokkaido University, Kita-13, Nishi-8, Kita-ku, Sapporo 060-8628, Japan (Received September 29, 2015; accepted in revised form November 6, 2015; published online March 15, 2016)\",\"PeriodicalId\":121793,\"journal\":{\"name\":\"Insights Concerning the Fukushima Daiichi Nuclear Accident Vol. 4\",\"volume\":\"47 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Insights Concerning the Fukushima Daiichi Nuclear Accident Vol. 4\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3327/TAESJ.J15.018\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Insights Concerning the Fukushima Daiichi Nuclear Accident Vol. 4","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3327/TAESJ.J15.018","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Measures to Improve Robustness of Primary Containment Vessel and Operation of Filtered Containment Venting System Based on the Lessons from the Containment Leak at Fukushima Dai-ichi Nuclear Power Station Unit 2
Shinichi KAWAMURA, Suguru OOKI and Tadashi NARABAYASHI Nuclear Asset Management Department, Tokyo Electric Power Company, 1-1-3 Uchisaiwai-cho, Chiyoda-ku, Tokyo 100-8560, Japan R&D Department, TEPCO Research Institute, Tokyo Electric Power Company, 4-1 Egasaki-cho, Tsurumi-ku, Yokohama 230-8510, Japan Division of Energy and Environmental Systems, Graduate School of Engineering, Hokkaido University, Kita-13, Nishi-8, Kita-ku, Sapporo 060-8628, Japan (Received September 29, 2015; accepted in revised form November 6, 2015; published online March 15, 2016)