{"title":"从东日本大地震后福岛第二核电站应急响应中吸取教训的改进核应急管理体系","authors":"S. Kawamura, T. Narabayashi","doi":"10.3327/TAESJ.J15.013","DOIUrl":null,"url":null,"abstract":"Three nuclear reactors at Fukushima Daini Nuclear Power Station lost all their ultimate heat sinks owing to damage from the tsunami caused by the Great East Japan Earthquake on March 11, 2011. Water was injected into the reactors by alternate measures, damaged cooling systems were re-stored with promptly supplied substitute materials, and all the reactors were brought to a cold shutdown state within four days. Lessons learned from this experience were identified to improve emergency management, especially in the areas of strategic response planning, logistics, and functions supporting response activities continuing over a long period. It was found that continuous planning activities reflecting information from plant parameters and response action results were important, and that relevant functions in emergency response organizations should be integrated. Logistics were handled successfully but many difficulties were experienced. Therefore, their functions should be clearly established and improved by emergency response organizations. Supporting emergency responders in the aspects of their physical and mental conditions was important for sustaining continuous response. As a platform for improvement, the concept of the Incident Command System was applied for the first time to a nuclear emergency management system, with specific improvement ideas such as a phased approach in response planning and common operation pictures.","PeriodicalId":121793,"journal":{"name":"Insights Concerning the Fukushima Daiichi Nuclear Accident Vol. 4","volume":"293 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Improved Nuclear Emergency Management System Reflecting Lessons Learned from the Emergency Response at Fukushima Daini Nuclear Power Station after the Great East Japan Earthquake\",\"authors\":\"S. Kawamura, T. Narabayashi\",\"doi\":\"10.3327/TAESJ.J15.013\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Three nuclear reactors at Fukushima Daini Nuclear Power Station lost all their ultimate heat sinks owing to damage from the tsunami caused by the Great East Japan Earthquake on March 11, 2011. Water was injected into the reactors by alternate measures, damaged cooling systems were re-stored with promptly supplied substitute materials, and all the reactors were brought to a cold shutdown state within four days. Lessons learned from this experience were identified to improve emergency management, especially in the areas of strategic response planning, logistics, and functions supporting response activities continuing over a long period. It was found that continuous planning activities reflecting information from plant parameters and response action results were important, and that relevant functions in emergency response organizations should be integrated. Logistics were handled successfully but many difficulties were experienced. Therefore, their functions should be clearly established and improved by emergency response organizations. Supporting emergency responders in the aspects of their physical and mental conditions was important for sustaining continuous response. As a platform for improvement, the concept of the Incident Command System was applied for the first time to a nuclear emergency management system, with specific improvement ideas such as a phased approach in response planning and common operation pictures.\",\"PeriodicalId\":121793,\"journal\":{\"name\":\"Insights Concerning the Fukushima Daiichi Nuclear Accident Vol. 4\",\"volume\":\"293 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Insights Concerning the Fukushima Daiichi Nuclear Accident Vol. 4\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3327/TAESJ.J15.013\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Insights Concerning the Fukushima Daiichi Nuclear Accident Vol. 4","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3327/TAESJ.J15.013","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

由于2011年3月11日东日本大地震引发的海啸的破坏,福岛第二核电站的三个核反应堆失去了所有的最终散热器。通过替代措施向反应堆注水,损坏的冷却系统用及时供应的替代材料重新储存,所有反应堆在4天内进入冷停堆状态。确定了从这一经验中吸取的教训,以改进应急管理,特别是在战略应对规划、后勤和支持长期持续的应对活动的职能等领域。研究发现,反映工厂参数信息和应急行动结果的持续规划活动很重要,应急组织中的相关职能应加以整合。后勤工作处理得很成功,但遇到了许多困难。因此,应急组织应明确其职能,完善其职能。在身体和精神状况方面支助应急人员对于维持持续的反应非常重要。作为改进平台,首次将“事件指挥系统”概念应用于核应急管理体系,提出了分阶段响应规划、统一操作图片等具体改进思路。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Improved Nuclear Emergency Management System Reflecting Lessons Learned from the Emergency Response at Fukushima Daini Nuclear Power Station after the Great East Japan Earthquake
Three nuclear reactors at Fukushima Daini Nuclear Power Station lost all their ultimate heat sinks owing to damage from the tsunami caused by the Great East Japan Earthquake on March 11, 2011. Water was injected into the reactors by alternate measures, damaged cooling systems were re-stored with promptly supplied substitute materials, and all the reactors were brought to a cold shutdown state within four days. Lessons learned from this experience were identified to improve emergency management, especially in the areas of strategic response planning, logistics, and functions supporting response activities continuing over a long period. It was found that continuous planning activities reflecting information from plant parameters and response action results were important, and that relevant functions in emergency response organizations should be integrated. Logistics were handled successfully but many difficulties were experienced. Therefore, their functions should be clearly established and improved by emergency response organizations. Supporting emergency responders in the aspects of their physical and mental conditions was important for sustaining continuous response. As a platform for improvement, the concept of the Incident Command System was applied for the first time to a nuclear emergency management system, with specific improvement ideas such as a phased approach in response planning and common operation pictures.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信