{"title":"考虑分布式储能系统集成的配电网协同运行","authors":"Haijun Xing, H. Fan, Ranlong Guo, Jing Wang","doi":"10.1109/PESGM41954.2020.9281732","DOIUrl":null,"url":null,"abstract":"Distributed energy storage system (DESS) becomes more and more popular in the distribution network, especially in the era with largely increased the renewable energies. This paper proposed the day-ahead coordinated operation method of active distribution network considering distributed energy storage system integration and network reconfiguration. The objective is to minimize the energy loss of distribution network within one day. The DESS optimal operation model is proposed. The network reconfiguration considered in this paper is a multiple time segment reconfiguration. The purpose is to find a topology structure which can adapt to the load and DG variety within 24 hours. The proposed model and algorithm is verified with a TPC 84-bus system, the different switch operation times and different substation voltages are discussed. The results show the adaptability of the proposed methodology and the necessity to include the DESS and network reconfiguration in the coordinated operation.","PeriodicalId":106476,"journal":{"name":"2020 IEEE Power & Energy Society General Meeting (PESGM)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-08-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Distribution Network Coordinated Operation Considering Distributed Energy Storage System Integration\",\"authors\":\"Haijun Xing, H. Fan, Ranlong Guo, Jing Wang\",\"doi\":\"10.1109/PESGM41954.2020.9281732\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Distributed energy storage system (DESS) becomes more and more popular in the distribution network, especially in the era with largely increased the renewable energies. This paper proposed the day-ahead coordinated operation method of active distribution network considering distributed energy storage system integration and network reconfiguration. The objective is to minimize the energy loss of distribution network within one day. The DESS optimal operation model is proposed. The network reconfiguration considered in this paper is a multiple time segment reconfiguration. The purpose is to find a topology structure which can adapt to the load and DG variety within 24 hours. The proposed model and algorithm is verified with a TPC 84-bus system, the different switch operation times and different substation voltages are discussed. The results show the adaptability of the proposed methodology and the necessity to include the DESS and network reconfiguration in the coordinated operation.\",\"PeriodicalId\":106476,\"journal\":{\"name\":\"2020 IEEE Power & Energy Society General Meeting (PESGM)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-08-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 IEEE Power & Energy Society General Meeting (PESGM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PESGM41954.2020.9281732\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE Power & Energy Society General Meeting (PESGM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PESGM41954.2020.9281732","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

分布式储能系统(DESS)在配电网中越来越受欢迎,特别是在可再生能源大量增加的时代。提出了考虑分布式储能系统集成和网络重构的有源配电网日前协调运行方法。目标是使配电网在一天内的能量损失最小化。提出了DESS优化运行模型。本文考虑的网络重构是一个多时间段重构。目的是寻找一种能够适应24小时内负载和DG变化的拓扑结构。以tpc84母线系统为例,对所提出的模型和算法进行了验证,并对不同开关操作次数和不同变电站电压进行了讨论。结果表明了所提方法的适应性,以及在协调运行中考虑DESS和网络重构的必要性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Distribution Network Coordinated Operation Considering Distributed Energy Storage System Integration
Distributed energy storage system (DESS) becomes more and more popular in the distribution network, especially in the era with largely increased the renewable energies. This paper proposed the day-ahead coordinated operation method of active distribution network considering distributed energy storage system integration and network reconfiguration. The objective is to minimize the energy loss of distribution network within one day. The DESS optimal operation model is proposed. The network reconfiguration considered in this paper is a multiple time segment reconfiguration. The purpose is to find a topology structure which can adapt to the load and DG variety within 24 hours. The proposed model and algorithm is verified with a TPC 84-bus system, the different switch operation times and different substation voltages are discussed. The results show the adaptability of the proposed methodology and the necessity to include the DESS and network reconfiguration in the coordinated operation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信