{"title":"BIM与传统桥台尺寸、体积分析方法的比较","authors":"Rayhan Anugrah Yuliano, N. Martina, Safri .","doi":"10.32722/arcee.v3i02.4157","DOIUrl":null,"url":null,"abstract":"The development of the industrial era 4.0 is rapid, one of which is the BIM (Building Information Modeling) method for surveying activities, namely 3D Scanning. The 3D Scanning method, which can obtain millions of points in point clouds in one scan, is expected to provide higher accuracy and more efficient and effective operating time than conventional methods. Conventional methods, which still apply human plotting, require more time and human resources because they have to move from one point to another, and their accuracy is highly dependent on the quality of human resources. This research was conducted at the Interchange Project of the Batang Industrial Estate, Central Java, and aimed to compare the dimensions, volume, and shop drawings of the 3D Scanning method with the conventional method and the advantages of the 3D Scanning and Modeling method. The results obtained in this study are that there is an average dimension difference of 0.007 m from the shop drawing image, then there is a difference in the average coordinate point of 0.028 m which causes the Abutment position to shift from the shop drawing image. BIM is one method for get the volume of structures on Interchange Project with careful results and faster process. The calculated volume is based on shop drawings. The results showed that the difference between the conventional BIM method in the volume of concrete was 1.156%, and in the granular heap, there was a difference of 1.292%. The advantages of these 2 BIM methods are how they operate, which has started to implement an automation system and requires less time than conventional methods.","PeriodicalId":378971,"journal":{"name":"Applied Research on Civil Engineering and Environment (ARCEE)","volume":"263 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-05-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Comparison of BIM and Conventional Method to Analyze Dimension and Volume of Abutment\",\"authors\":\"Rayhan Anugrah Yuliano, N. Martina, Safri .\",\"doi\":\"10.32722/arcee.v3i02.4157\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The development of the industrial era 4.0 is rapid, one of which is the BIM (Building Information Modeling) method for surveying activities, namely 3D Scanning. The 3D Scanning method, which can obtain millions of points in point clouds in one scan, is expected to provide higher accuracy and more efficient and effective operating time than conventional methods. Conventional methods, which still apply human plotting, require more time and human resources because they have to move from one point to another, and their accuracy is highly dependent on the quality of human resources. This research was conducted at the Interchange Project of the Batang Industrial Estate, Central Java, and aimed to compare the dimensions, volume, and shop drawings of the 3D Scanning method with the conventional method and the advantages of the 3D Scanning and Modeling method. The results obtained in this study are that there is an average dimension difference of 0.007 m from the shop drawing image, then there is a difference in the average coordinate point of 0.028 m which causes the Abutment position to shift from the shop drawing image. BIM is one method for get the volume of structures on Interchange Project with careful results and faster process. The calculated volume is based on shop drawings. The results showed that the difference between the conventional BIM method in the volume of concrete was 1.156%, and in the granular heap, there was a difference of 1.292%. The advantages of these 2 BIM methods are how they operate, which has started to implement an automation system and requires less time than conventional methods.\",\"PeriodicalId\":378971,\"journal\":{\"name\":\"Applied Research on Civil Engineering and Environment (ARCEE)\",\"volume\":\"263 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-05-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Applied Research on Civil Engineering and Environment (ARCEE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.32722/arcee.v3i02.4157\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Applied Research on Civil Engineering and Environment (ARCEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32722/arcee.v3i02.4157","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
工业4.0时代发展迅速,其中之一就是用于测量活动的BIM (Building Information Modeling)方法,即3D扫描。3D扫描方法可以在一次扫描中获得点云中的数百万个点,有望提供比传统方法更高的精度和更高效的操作时间。传统的方法仍然需要人工绘图,需要更多的时间和人力资源,因为它们必须从一个点移动到另一个点,而且它们的准确性高度依赖于人力资源的质量。本研究以中爪哇巴塘工业区立交项目为研究对象,旨在比较3D扫描法与传统方法的尺寸、体积、施工图,以及3D扫描与建模方法的优势。本研究得到的结果是,与店铺图图像的平均尺寸差为0.007 m,那么平均坐标点差为0.028 m,这就导致了基台位置与店铺图图像的偏移。BIM是立交工程中获得结构体量的一种方法,结果严谨,过程快速。计算的体积是基于车间图纸。结果表明:与常规BIM方法在混凝土体积上的差异为1.156%,在颗粒堆上的差异为1.292%。这两种BIM方法的优势在于它们的操作方式,它已经开始实施自动化系统,比传统方法需要更少的时间。
Comparison of BIM and Conventional Method to Analyze Dimension and Volume of Abutment
The development of the industrial era 4.0 is rapid, one of which is the BIM (Building Information Modeling) method for surveying activities, namely 3D Scanning. The 3D Scanning method, which can obtain millions of points in point clouds in one scan, is expected to provide higher accuracy and more efficient and effective operating time than conventional methods. Conventional methods, which still apply human plotting, require more time and human resources because they have to move from one point to another, and their accuracy is highly dependent on the quality of human resources. This research was conducted at the Interchange Project of the Batang Industrial Estate, Central Java, and aimed to compare the dimensions, volume, and shop drawings of the 3D Scanning method with the conventional method and the advantages of the 3D Scanning and Modeling method. The results obtained in this study are that there is an average dimension difference of 0.007 m from the shop drawing image, then there is a difference in the average coordinate point of 0.028 m which causes the Abutment position to shift from the shop drawing image. BIM is one method for get the volume of structures on Interchange Project with careful results and faster process. The calculated volume is based on shop drawings. The results showed that the difference between the conventional BIM method in the volume of concrete was 1.156%, and in the granular heap, there was a difference of 1.292%. The advantages of these 2 BIM methods are how they operate, which has started to implement an automation system and requires less time than conventional methods.