{"title":"求解钢卷仓库起重机调度的动态规划方法","authors":"Xie Xie, Q. Zhu, Yanping Li, Huibo Zhou, Yongyue Zheng, Xiaoli Li","doi":"10.1109/MIC.2013.6757984","DOIUrl":null,"url":null,"abstract":"This paper focuses on a single crane scheduling problem in order to pick all demanded coils for downstream stage production or for customer which is motivated by cooled-rolling material warehouse in the iron and steel enterprise. If a demanded coil is in the upper level, it can be picked up directly to designated place (transportation operation). If a demanded coil in the lower level is blocked by one or two un-demanded coils, the coil can not be transported until all the blocking coils are picked up to another position (shuffling operation). Both the transportation and the shuffling operations are performed by a mounted traveling crane. Our problem combines transportation and shuffling simultaneously for crane to pick up all demanded coils as early as possible to designated place, that is, the optimality criterion considered is the minimum makespan. We show its complexity by reduction from a demonstrated strongly NP-hard problem. Furthermore we introduce a dynamic programming (DP) for solving the problem optimally.","PeriodicalId":404630,"journal":{"name":"Proceedings of 2013 2nd International Conference on Measurement, Information and Control","volume":"39 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"A dynamic programming for solving crane scheduling in steel coil warehouse\",\"authors\":\"Xie Xie, Q. Zhu, Yanping Li, Huibo Zhou, Yongyue Zheng, Xiaoli Li\",\"doi\":\"10.1109/MIC.2013.6757984\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper focuses on a single crane scheduling problem in order to pick all demanded coils for downstream stage production or for customer which is motivated by cooled-rolling material warehouse in the iron and steel enterprise. If a demanded coil is in the upper level, it can be picked up directly to designated place (transportation operation). If a demanded coil in the lower level is blocked by one or two un-demanded coils, the coil can not be transported until all the blocking coils are picked up to another position (shuffling operation). Both the transportation and the shuffling operations are performed by a mounted traveling crane. Our problem combines transportation and shuffling simultaneously for crane to pick up all demanded coils as early as possible to designated place, that is, the optimality criterion considered is the minimum makespan. We show its complexity by reduction from a demonstrated strongly NP-hard problem. Furthermore we introduce a dynamic programming (DP) for solving the problem optimally.\",\"PeriodicalId\":404630,\"journal\":{\"name\":\"Proceedings of 2013 2nd International Conference on Measurement, Information and Control\",\"volume\":\"39 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of 2013 2nd International Conference on Measurement, Information and Control\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/MIC.2013.6757984\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of 2013 2nd International Conference on Measurement, Information and Control","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/MIC.2013.6757984","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文研究了钢铁企业以冷轧物料仓库为动力,为下游生产或客户挑选所需卷板的单台起重机调度问题。如果需要的线圈在上层,可以直接取到指定地点(运输操作)。如果下层需要的线圈被一个或两个不需要的线圈阻塞,则该线圈不能运输,直到所有阻塞线圈被拾取到另一个位置(洗牌操作)。运输和洗牌作业均由安装的移动起重机完成。我们的问题将运输和拖曳同时进行,使起重机能够尽早将所有需要的卷材运到指定地点,即考虑的最优准则是最小完工时间。我们通过一个已证明的强np困难问题的约简来证明它的复杂性。在此基础上,引入一种动态规划方法来最优求解该问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A dynamic programming for solving crane scheduling in steel coil warehouse
This paper focuses on a single crane scheduling problem in order to pick all demanded coils for downstream stage production or for customer which is motivated by cooled-rolling material warehouse in the iron and steel enterprise. If a demanded coil is in the upper level, it can be picked up directly to designated place (transportation operation). If a demanded coil in the lower level is blocked by one or two un-demanded coils, the coil can not be transported until all the blocking coils are picked up to another position (shuffling operation). Both the transportation and the shuffling operations are performed by a mounted traveling crane. Our problem combines transportation and shuffling simultaneously for crane to pick up all demanded coils as early as possible to designated place, that is, the optimality criterion considered is the minimum makespan. We show its complexity by reduction from a demonstrated strongly NP-hard problem. Furthermore we introduce a dynamic programming (DP) for solving the problem optimally.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信