C. Bovo, Luca Radaelli, A. Berizzi, A. Mansoldo, M. Norton
{"title":"全面比较了不同技术对电力系统无功规划的影响","authors":"C. Bovo, Luca Radaelli, A. Berizzi, A. Mansoldo, M. Norton","doi":"10.1109/PSCC.2014.7038300","DOIUrl":null,"url":null,"abstract":"The Irish transmission network is quickly changing its basic features from many points of view, and the consequent potential scenarios increase uncertainty in planning future network. In particular, the importance of wind power generation has risen in the last years so much as to be considered among the most important and affordable Renewable Energy Sources (RES), with a growing rate faster than other technologies. This requires new criteria to set out the appropriate architecture for future grids, in terms of topology, technology and control structures. This paper describes how to use a var planning methodology to identify reactive needs for future mixed meshed AC/DC system, taking into account different transmission technologies.","PeriodicalId":155801,"journal":{"name":"2014 Power Systems Computation Conference","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A thorough comparison among impact of different technologies on power system reactive planning\",\"authors\":\"C. Bovo, Luca Radaelli, A. Berizzi, A. Mansoldo, M. Norton\",\"doi\":\"10.1109/PSCC.2014.7038300\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Irish transmission network is quickly changing its basic features from many points of view, and the consequent potential scenarios increase uncertainty in planning future network. In particular, the importance of wind power generation has risen in the last years so much as to be considered among the most important and affordable Renewable Energy Sources (RES), with a growing rate faster than other technologies. This requires new criteria to set out the appropriate architecture for future grids, in terms of topology, technology and control structures. This paper describes how to use a var planning methodology to identify reactive needs for future mixed meshed AC/DC system, taking into account different transmission technologies.\",\"PeriodicalId\":155801,\"journal\":{\"name\":\"2014 Power Systems Computation Conference\",\"volume\":\"13 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 Power Systems Computation Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PSCC.2014.7038300\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 Power Systems Computation Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PSCC.2014.7038300","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A thorough comparison among impact of different technologies on power system reactive planning
The Irish transmission network is quickly changing its basic features from many points of view, and the consequent potential scenarios increase uncertainty in planning future network. In particular, the importance of wind power generation has risen in the last years so much as to be considered among the most important and affordable Renewable Energy Sources (RES), with a growing rate faster than other technologies. This requires new criteria to set out the appropriate architecture for future grids, in terms of topology, technology and control structures. This paper describes how to use a var planning methodology to identify reactive needs for future mixed meshed AC/DC system, taking into account different transmission technologies.