{"title":"解除固定范围的项目:使用敏捷方法在项目范围中创建灵活性","authors":"Jeff Patton","doi":"10.1109/ADC.2003.1231465","DOIUrl":null,"url":null,"abstract":"Although it seems to be common knowledge that it's impossible to succeed in a project with fixed time, quality and scope, we often continue to try anyway. This experience report discusses our successful failure at running fixed time and scope projects. We say successful failure because we actually failed to fix scope but arrived at an acceptable way to vary scope and deliver on time in an environment not normally amenable to variable scope. We discuss the methods used and make recommendations on how we might unfix scope in our development environment.","PeriodicalId":325418,"journal":{"name":"Proceedings of the Agile Development Conference, 2003. ADC 2003","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2003-06-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":"{\"title\":\"Unfixing the fixed scope project: using agile methodologies to create flexibility in project scope\",\"authors\":\"Jeff Patton\",\"doi\":\"10.1109/ADC.2003.1231465\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Although it seems to be common knowledge that it's impossible to succeed in a project with fixed time, quality and scope, we often continue to try anyway. This experience report discusses our successful failure at running fixed time and scope projects. We say successful failure because we actually failed to fix scope but arrived at an acceptable way to vary scope and deliver on time in an environment not normally amenable to variable scope. We discuss the methods used and make recommendations on how we might unfix scope in our development environment.\",\"PeriodicalId\":325418,\"journal\":{\"name\":\"Proceedings of the Agile Development Conference, 2003. ADC 2003\",\"volume\":\"18 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2003-06-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"9\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Agile Development Conference, 2003. ADC 2003\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ADC.2003.1231465\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Agile Development Conference, 2003. ADC 2003","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ADC.2003.1231465","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Unfixing the fixed scope project: using agile methodologies to create flexibility in project scope
Although it seems to be common knowledge that it's impossible to succeed in a project with fixed time, quality and scope, we often continue to try anyway. This experience report discusses our successful failure at running fixed time and scope projects. We say successful failure because we actually failed to fix scope but arrived at an acceptable way to vary scope and deliver on time in an environment not normally amenable to variable scope. We discuss the methods used and make recommendations on how we might unfix scope in our development environment.