{"title":"基于实时参数校核的电力变压器经济运行","authors":"Xiying Chen, Zhizhong Guo","doi":"10.1109/PES.2006.1709193","DOIUrl":null,"url":null,"abstract":"If you possess accurate parameters of transformer and the power loss curve caused by loads, you can know the economic operation area of the transformer. The parameters of transformer and power loss characteristics are checked by curve fitting based on LSE (least square error) at real time using the data of distribution automation system. Thus power load are allotted properly to transformers according to their arrangements","PeriodicalId":267582,"journal":{"name":"2006 IEEE Power Engineering Society General Meeting","volume":"21 9","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Economic operation of power transformer based on real time parameter checking\",\"authors\":\"Xiying Chen, Zhizhong Guo\",\"doi\":\"10.1109/PES.2006.1709193\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"If you possess accurate parameters of transformer and the power loss curve caused by loads, you can know the economic operation area of the transformer. The parameters of transformer and power loss characteristics are checked by curve fitting based on LSE (least square error) at real time using the data of distribution automation system. Thus power load are allotted properly to transformers according to their arrangements\",\"PeriodicalId\":267582,\"journal\":{\"name\":\"2006 IEEE Power Engineering Society General Meeting\",\"volume\":\"21 9\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-10-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2006 IEEE Power Engineering Society General Meeting\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PES.2006.1709193\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 IEEE Power Engineering Society General Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PES.2006.1709193","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Economic operation of power transformer based on real time parameter checking
If you possess accurate parameters of transformer and the power loss curve caused by loads, you can know the economic operation area of the transformer. The parameters of transformer and power loss characteristics are checked by curve fitting based on LSE (least square error) at real time using the data of distribution automation system. Thus power load are allotted properly to transformers according to their arrangements